Smart Solution Generator >>>>

King Post Walls and Driven piles

King Post Walls and Driven Sheet Piles for new Logistics Centre

Aarsleff Ground Engineering were subcontracted by Winvic PLC to deliver two disciplines – Driven Steel Sheet Piles and Driven King Post Walls, as part of a 11.6-acre logistics centre development based at Manchester Airport for occupier The Hut Group, one of the world’s leading online beauty and wellbeing businesses.

The ICON development, which will be one of the largest in Europe, will provide logistics and content creation facilities totalling 168,000 sq ft and an additional 104,000 sq ft of office space over four floors housing up to 2,000 people…

Read more…

Download Case Study

,