• About Us
    • About Aarsleff Ground Engineering
    • Our Values and Mission
    • A Proud Heritage
    • Our Team
    • Current Vacancies
    • Health and Safety
    • Policies and Terms & Conditions
  • Market Sectors
    • Infrastructure
    • Energy
    • Residential
    • Rail
    • Commercial
    • Marine
    • Culture and Institution
  • Services
    • Services
      • Design & Engineering
      • Visual Design & Construction
      • Plant Hire and Workshop
    • Expertise
      • Piling
        • Driven Precast Concrete Piling
        • Timber Piles
        • H-Section Piles
        • CFA Piles
        • Bored Piles
        • Mini Piles
        • Steel Bearing Piles
        • Rigid Inclusions (RI)
        • Pile Testing
      • Retaining Walls
        • Secant Pile Walls
        • Sheet Piling
        • Cofferdams
        • King Post Walls
        • Contiguous Pile Walls
      • Ground Engineering
        • Slurry Walls
        • Soil Nailing
        • Ground Anchors
        • Grouting
        • Drilling Services
        • Deep Foundations
  • Projects
  • Sustainability
  • News
  • Contact
  • Get a Quote
Two workers with PPE and orange high-visibility clothing inspect a soil nail wall.

Projects

  • Filter projects:
  • Commercial
  • Culture and Institution
  • Energy
  • Infrastructure
  • Marine
  • Rail
  • Residential
  • Utilities

Location:

Sheerness Docks

View project

Location:

Martello Lakes, Kent

View project

Location:

Vitrum, Cambridge

View project
Aarsleff's yellow Junttan piling rig being used to drive precast concrete piles. A worker in PPE stands nearby the rig to guide the rig operator.

Location:

Didcot, Oxfordshire

View project

Location:

Carmarthen, West Wales

View project
An aerial view of a precast and steel tube piling project at Tilbury Docks.

Location:

Tilbury Docks

View project
Rigid inclusions being installed by a large drilling rig for at St Modwen Park, Burton. A worker in PPE stands beside the rig and examines paperwork.

Location:

St Modwen Park, Burton

View project
Aarsleff delivering ground improvement and piling works for Avonmouth Plot 3 Matrix 49 project.

Location:

Avonmouth Plot 3 Case Study

View project
Concrete foundations for houses made using square piles and pre-cast ground beams.

Location:

Swinton Project

View project
Wide-angle shot of soil nails installed on a slope. Heavy machinery is parked in front and a transmission tower is visible on top of the slope.

Location:

M1 J33, Rotherham Project

View project
Yellow drilling rigs sitting on a snowy construction site.

Location: Penygawsi Primary School

Penygawsi Primary School

View project
Aarsleff Ground Engineering delivering sheet piling and driven precast concrete piling works.

Location: Hartlepool

Hartlepool

View project
Aerial view of a cleared construction site with square precast concrete piles emerging from the ground. A large field and trees are visible in the background.

Location: Skegness TEC

Skegness TEC

View project
Steel sheet piles being installed by a rig at night. An Aarsleff worker in safety gear observes nearby.

Location: North Shields Metro Bridge

North Shields Metro Bridge

View project
Aarsleff installing steel sheet piles to form a cofferdam within the University of Southampton campus.

Location: University of Southampton

University of Southampton

View project
Double rainbow arching over a construction site with Aarsleff's piling rig and a worker in the foreground.

Location: Highbridge, Somerset

Highbridge, Somerset

View project
Aarsleff's yellow Junttan piling rig being used to drive precast concrete piles. A worker in PPE stands nearby the rig to guide the rig operator.

Location: North Coates, Lincolnshire

North Coates

View project
Piling project at Redhills, Durham

Location: Redhills, Durham

Redhills, Durham

View project
Yellow piling rig sits on a muddy site under a cloudy sky. Other heavy machinery is visible in the background.

Location: Walpole Substation

Walpole Substation

View project
A worker in a orange Aarsleff jacket and blue hard hat stands near a yellow piling machine under a blue sky.

Location: Emmer Green, Reading

Emmer Green

View project
Cofferdam

Location: Forest Town, Mansfield

Forest Town, Mansfield

View project
A open bore King Post Wall in Northampton.

Location: Northampton

Welford Road, Northampton

View project
A yellow Aarsleff pile driver being used to install precast concrete piles under a blue sky.

Location: Bridgwater

Bridgwater, Costa

View project
A worker wearing a orange Aarsleff hi-vis jacket and PPE stands in front of sheet piles being installed. The sun shines brightly between the sheet piles.

Location: Sleaford

A17 Embankment, Sleaford

View project
Aarsleff's Junttan PM 20HLC piling rig in operation with two workers present. Another piling rig can be seen in the background.

Location: Prestwich

Prestwich

View project
Deeside piling project

Location: Deeside Ph 1

Deeside – Ph 1

View project
A completed king post wall solution by Aarsleff in Erdington, Birmingham.

Location: Birmingham Erdington

Birmingham Erdington

View project
Aarsleff's yellow Junttan PM16-1 piling rig under a clear, blue sky.

Location: Derby

Derby Logistics Park

View project
A sheet pile wall being installed by two Aarsleff workers using a pile driving rig. One worker is standing near the rig and use his hand to guide.

Location: Stockport

Stockport

View project
Aerial view of soil nails being installed with a yellow drilling rig. A red excavator and workers can also be seen on site.

Location: Magnavale, Chesterfield

Magnavale, Chesterfield

View project
Klemm 702 piling rig at Durham Castle project

Location: Norman Chapel, Durham Castle

Norman Chapel, Durham Castle

View project
A construction worker in orange Aarsleff PPE guides a trench sheet being lowered by a crane.

Location: Birtley

Birtley Phase 3

View project
Aarsleff team constructing a sheet pile wall for a multi-discipline project in Great Blakenham.

Location: Great Blakenham

Great Blakenham

View project
Aerial shot of the completed king post wall for Jewson’s Chesterfield branch.

Location: Chesterfield

Chesterfield, Jewsons

View project
Aerial view of a precast reinforced concrete piles being installed. Heavy equipment and piling rigs is on site.

Location: St Helens

St Helens

View project
Bristol XL piling project

Location: Bristol

Bristol XL

View project
A sheet piling solution to bridge an existing sewer. The solution appears neat from the bank side.

Location: Newark

Newark Welcome Break

View project
A drilling rig stands on a snow covered hillside. Mountains stretch across the horizon under a cloudy sky.

Location: Scotland

Dunmaglass Wind Farm

View project
Four Aarsleff workers walk across a construction site. They wear orange hi-vis clothing and white hard hats. Precast concrete piles and heavy machinery is visible in the background.

Location: Boston, Lincolnshire

Triton Knoll Offshore Windfarm

View project
Aerial view of Aarsleff constructing a soil nail slope for the Elan Valley Aqueduct Rehabilitation project.

Location: Frydd Wood, Wales

Elan Aqueduct, Frydd Wood

View project
A sheet piled cofferdam on the River Severn, near Stourport.

Location: Stourport, Birmingham

Birmingham Resilience Scheme

View project
Panorama shot of cofferdam construction for a new outfall structure into the River Trent. Moored boats can be seen on the other side of the river.

Location: Newark, Nottingham

Newark Re-Sewerage

View project
A yellow and black Aarsleff piling rig stands near a building. A worker in an orange safety vest stands to the right near a metal barricade.

Location: Hull

Bio-Mass Plant, Hull

View project
Aarsleff's Junttan PM20 piling rig in use for the Dalmuir Waste Water Treatment project.

Location: Dalmuir, Scotland

Dalmuir Waste Water Treatment Works

View project
A wide shot of a construction site with square precast concrete piles placed into ground in a grid pattern. A pile driving rig is visible in the background.

Location: Preston, Lancashire

Preston Waste Water Treatment Works

View project
A completed king post wall with steel sheet infills

Location: Belper, Derbyshire

Belper, Derwent Street

View project
A king post wall completed for a residential site in Willerby.

Location: Willerby, Hull

Willerby Phase 2

View project
Close-up of Aarsleff's yellow Junttan PM 16 pile driving rig. A worker in safety gear guides the rig operator.

Location: Kings Lynn

Highgate School, Kings Lynn

View project
Aerial view of sheet piling works underway at Solent University.

Location: Southampton

Solent University, Southampton

View project
Aarsleff performs drilling and grouting works with specialised machinery. One worker operates the rig while two workers observe the works.

Location: Leeds

Shakespeare School, Leeds

View project
1 2 Next

The Latest. News, podcasts & projects

News

Aarsleff Ground Engineering earns 8th consecutive prestigious global health and safety gold award from The Royal Society for the Prevention of Accidents (RoSPA)

21 Jul
2025

Company News

Do you know what the different jobs in construction are?

30 Sep
2024

Company News

Precast Piles for Wastewater Tanks: A Strong Foundation

17 Apr
2024

Company News

Navigating Rotary Bored Piling: Answering Your Top Questions

16 Apr
2024

Company News

Retaining Wall Techniques to Achieve Slope Stabilisation

16 Jan
2024

Company News

Let’s Talk… Slope Stabilisation

15 Jan
2024

Company News

Value Engineering: Creating Value for Projects and the Planet

12 Dec
2023

Company News

Founding Wastewater Work Across The UK

04 Oct
2023

Company News

FPS’ new Sustainability Charter

07 Aug
2023

Aarsleff Logo
  • Solutions Generator
  • Careers
  • News
  • Articles
  • Testimonials
  • Cookie Policy
  • Disclaimer
  • Podcast Player
  • Terms and Conditions
  • Site Map

E: enquiries@aarsleff.co.uk

T: 01636 611140

Aarsleff Ground Engineering Ltd
Hawton Lane, Balderton,
Newark, Nottinghamshire
NG24 3BU

Privacy Policy

Join our mailing list

Follow us on

Close

Close

Join our mailing list

See our subscribe page.

We use cookies to enhance our website and to track user behaviour.
You can set your cookie preferences here and read more on the cookies we use.
Accept Only Required Accept All Cookies

A leading UK ground engineering specialist, focusing on multi-discipline excellence and value engineering. We design and deliver some of the UK’s largest ground engineering projects.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

Our vision is to bring confidence to those constructing the landscape of tomorrow .

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

1947. Central Jutland, Denmark. Per Aarsleff borrowed 10,000 Danish Kroner from his father’s life insurance, bought an excavator, and founded Northern Europe’s leading contracting company.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

Our biggest asset, our team is composed of the leading experts in ground engineering. Working with collaboration and cohesion at the core of our business, we can guarantee a quick and founded answer to all your questions.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

We recruit and reward our people based on our ‘Step into the Blue’ company culture, where we embrace the core values of Life and Health, Trust, and Responsibility.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

We do everything to ensure our team and yours work safely on our sites. With our core value of Life & Health, we see safety as a cultural pillar.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

Our ISO accreditations are an assurance to you that we take governance seriously. Read our policies to discover more.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

The projects that keep society running. Bridges, buildings, transit and rail facilities, embankment support, marine and offshore facilities, mines, airports, and water projects.

Close-up view of steel reinforcement cages at a construction site. A yellow KLEMM drilling rig is in the background.

Keeping things turning. Sewage Treatment Works, Waste Water Treatment Works, Wind Farms and Wind Turbines, Biomass Plants, and Power stations.

Aarsleff's Junttan PM 20HLC piling rig in operation with two workers present. Another piling rig can be seen in the background.

Meeting society’s needs. Nursing and care homes, MOD buildings, Schools and Universities, and small or large-sized residential developments.

Three piling rigs positioned on a muddy site under a blue sky. Construction workers are seen near the rigs.

Staying on the move. Remediation, bridges, and foundation work are integral to keeping the industry running smoothly.

Aarsleff worker kneeing down on one knee with a yellow piling rig and concrete piles in the background. The worker is wearing high-visibility clothing and a white hard hat.

The landscape of the marketplace. Mega-retail sheds, distribution warehouses, University accommodation, and major supermarket and household name units.

Commercial piling projects

Keeping things afloat. Ports and harbours, coastal defences, river embankments and inland waterways.

An aerial view of the Port of Hanstholm.

Supporting culture and learning with specialist piling and ground engineering. From museums and libraries to heritage sites and institutional buildings.

Three piling rigs positioned on a muddy site under a blue sky. Construction workers are seen near the rigs.