• About Us
    • About Aarsleff Ground Engineering
    • Our Values and Mission
    • A Proud Heritage
    • Our Team
    • Current Vacancies
    • Health and Safety
    • Policies and Terms & Conditions
  • Market Sectors
    • Infrastructure
    • Energy
    • Residential
    • Rail
    • Commercial
    • Marine
    • Culture and Institution
  • Services
    • Services
      • Design & Engineering
      • Visual Design & Construction
      • Plant Hire and Workshop
    • Expertise
      • Piling
        • Driven Precast Concrete Piling
        • Timber Piles
        • H-Section Piles
        • CFA Piles
        • Bored Piles
        • Mini Piles
        • Steel Bearing Piles
        • Rigid Inclusions (RI)
        • Pile Testing
      • Retaining Walls
        • Secant Pile Walls
        • Sheet Piling
        • Cofferdams
        • King Post Walls
        • Contiguous Pile Walls
      • Ground Engineering
        • Slurry Walls
        • Soil Nailing
        • Ground Anchors
        • Grouting
        • Drilling Services
        • Deep Foundations
  • Projects
  • Sustainability
  • News
  • Contact
  • Get a Quote
Two workers with PPE and orange high-visibility clothing inspect a soil nail wall.

Commercial

  • Filter projects:
  • Commercial
  • Culture and Institution
  • Energy
  • Infrastructure
  • Marine
  • Rail
  • Residential
  • Utilities

Location:

Vitrum, Cambridge

View project
Aarsleff's yellow Junttan piling rig being used to drive precast concrete piles. A worker in PPE stands nearby the rig to guide the rig operator.

Location:

Didcot, Oxfordshire

View project
An aerial view of a precast and steel tube piling project at Tilbury Docks.

Location:

Tilbury Docks

View project
Rigid inclusions being installed by a large drilling rig for at St Modwen Park, Burton. A worker in PPE stands beside the rig and examines paperwork.

Location:

St Modwen Park, Burton

View project
Aarsleff delivering ground improvement and piling works for Avonmouth Plot 3 Matrix 49 project.

Location:

Avonmouth Plot 3 Case Study

View project
Wide-angle shot of soil nails installed on a slope. Heavy machinery is parked in front and a transmission tower is visible on top of the slope.

Location:

M1 J33, Rotherham Project

View project
Aarsleff's yellow Junttan piling rig being used to drive precast concrete piles. A worker in PPE stands nearby the rig to guide the rig operator.

Location: North Coates, Lincolnshire

North Coates

View project
A yellow Aarsleff pile driver being used to install precast concrete piles under a blue sky.

Location: Bridgwater

Bridgwater, Costa

View project
Deeside piling project

Location: Deeside Ph 1

Deeside – Ph 1

View project
Aarsleff's yellow Junttan PM16-1 piling rig under a clear, blue sky.

Location: Derby

Derby Logistics Park

View project
Aerial view of soil nails being installed with a yellow drilling rig. A red excavator and workers can also be seen on site.

Location: Magnavale, Chesterfield

Magnavale, Chesterfield

View project
Aarsleff team constructing a sheet pile wall for a multi-discipline project in Great Blakenham.

Location: Great Blakenham

Great Blakenham

View project
Aerial shot of the completed king post wall for Jewson’s Chesterfield branch.

Location: Chesterfield

Chesterfield, Jewsons

View project
Aerial view of a precast reinforced concrete piles being installed. Heavy equipment and piling rigs is on site.

Location: St Helens

St Helens

View project
Bristol XL piling project

Location: Bristol

Bristol XL

View project
A sheet piling solution to bridge an existing sewer. The solution appears neat from the bank side.

Location: Newark

Newark Welcome Break

View project
A soil nail wall being installed by Aarsleff for the construction of a new IKEA store in Exeter. Heavy machinery can be seen.

Location: Exeter

Ikea, Newcourt Way

View project
Aarsleff's Junttan piling rig driving precast concrete piles in Avonmouth. A transmission tower is visible in the background.

Location: Avonmouth

Giant Warehouses

View project
Construction site featuring Three orange piling machines in use to install a sheet pile wall. An Aarsleff van is parked nearby.

Location: Bedford

Bell Farm

View project
Precast concrete piles being installed in Peterborough by Aarsleff at dusk. A worker stands near one of the piling rigs.

Location: Peterborough

Distribution Warehouses

View project

The Latest. News, podcasts & projects

News

Aarsleff Ground Engineering earns 8th consecutive prestigious global health and safety gold award from The Royal Society for the Prevention of Accidents (RoSPA)

21 Jul
2025

Company News

Do you know what the different jobs in construction are?

30 Sep
2024

Company News

Precast Piles for Wastewater Tanks: A Strong Foundation

17 Apr
2024

Company News

Navigating Rotary Bored Piling: Answering Your Top Questions

16 Apr
2024

Company News

Retaining Wall Techniques to Achieve Slope Stabilisation

16 Jan
2024

Company News

Let’s Talk… Slope Stabilisation

15 Jan
2024

Company News

Value Engineering: Creating Value for Projects and the Planet

12 Dec
2023

Company News

Founding Wastewater Work Across The UK

04 Oct
2023

Company News

FPS’ new Sustainability Charter

07 Aug
2023

Aarsleff Logo
  • Solutions Generator
  • Careers
  • News
  • Articles
  • Testimonials
  • Cookie Policy
  • Disclaimer
  • Podcast Player
  • Terms and Conditions
  • Site Map

E: enquiries@aarsleff.co.uk

T: 01636 611140

Aarsleff Ground Engineering Ltd
Hawton Lane, Balderton,
Newark, Nottinghamshire
NG24 3BU

Privacy Policy

Join our mailing list

Follow us on

Close

Close

Join our mailing list

See our subscribe page.

We use cookies to enhance our website and to track user behaviour.
You can set your cookie preferences here and read more on the cookies we use.
Accept Only Required Accept All Cookies

A leading UK ground engineering specialist, focusing on multi-discipline excellence and value engineering. We design and deliver some of the UK’s largest ground engineering projects.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

Our vision is to bring confidence to those constructing the landscape of tomorrow .

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

1947. Central Jutland, Denmark. Per Aarsleff borrowed 10,000 Danish Kroner from his father’s life insurance, bought an excavator, and founded Northern Europe’s leading contracting company.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

Our biggest asset, our team is composed of the leading experts in ground engineering. Working with collaboration and cohesion at the core of our business, we can guarantee a quick and founded answer to all your questions.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

We recruit and reward our people based on our ‘Step into the Blue’ company culture, where we embrace the core values of Life and Health, Trust, and Responsibility.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

We do everything to ensure our team and yours work safely on our sites. With our core value of Life & Health, we see safety as a cultural pillar.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

Our ISO accreditations are an assurance to you that we take governance seriously. Read our policies to discover more.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

The projects that keep society running. Bridges, buildings, transit and rail facilities, embankment support, marine and offshore facilities, mines, airports, and water projects.

Close-up view of steel reinforcement cages at a construction site. A yellow KLEMM drilling rig is in the background.

Keeping things turning. Sewage Treatment Works, Waste Water Treatment Works, Wind Farms and Wind Turbines, Biomass Plants, and Power stations.

Aarsleff's Junttan PM 20HLC piling rig in operation with two workers present. Another piling rig can be seen in the background.

Meeting society’s needs. Nursing and care homes, MOD buildings, Schools and Universities, and small or large-sized residential developments.

Three piling rigs positioned on a muddy site under a blue sky. Construction workers are seen near the rigs.

Staying on the move. Remediation, bridges, and foundation work are integral to keeping the industry running smoothly.

Aarsleff worker kneeing down on one knee with a yellow piling rig and concrete piles in the background. The worker is wearing high-visibility clothing and a white hard hat.

The landscape of the marketplace. Mega-retail sheds, distribution warehouses, University accommodation, and major supermarket and household name units.

Commercial piling projects

Keeping things afloat. Ports and harbours, coastal defences, river embankments and inland waterways.

An aerial view of the Port of Hanstholm.

Supporting culture and learning with specialist piling and ground engineering. From museums and libraries to heritage sites and institutional buildings.

Three piling rigs positioned on a muddy site under a blue sky. Construction workers are seen near the rigs.