Capture

Trinity Farm, Knottingley is a 74-acre site destined to home for TK Maxx’s 1.37 million sq. floorspace commercial distribution warehouse facility. The site is being developed by Caddick Developments Ltd/TK Maxx with design and build by Caddick Construction Ltd, and when complete will provide much-needed employment for the area, estimated at 2,700 jobs, as well as providing a distribution centre hub for the growing retailer.

Piling works were awarded to Aarsleff Ground Engineering by main contractor Caddick Construction Ltd and are worth an estimated £503,000. Foundation work began on site January 2016 with the completion of the pile caps in April 2016.

Aarsleff was able to design, manufacture and install bespoke pile caps up to 1.80m in diameter in a short timeframe that allowed the client programme to proceed unaffected.

Read more…