Shakespeare School, Leeds

INSTALLING STEEL TUBES, SOIL NAILS AND DRILLING VERTICAL BORES FOR A NEW PRIMARY SCHOOL

Project Description

Scope of Works 109 No. Vertical Bores, 169 No. Soil Nails, 411 No. Thick Steel Tubes
Contractor BAM Construction Ltd
Equipment Boart AJ18, Klemm 806
Construction period 3rd August 2017 – 13th October 2017

Leeds City awarded BAM Construction Ltd North East the
contract to construct a two-storey new build primary school
and associated external works at Shakespeare Primary School
in Leeds. Leeds is a vibrant, extremely dynamic and successful
City. The City’s population is growing rapidly, and naturally this
is reflected in an increasing demand for school places. BAM
Construction Ltd awarded Aarsleff Ground Engineering the
foundation works for this scheme, comprising Driven Steel Tube
Piling, Drilling and Grouting of shallow mineworking beneath the
main school building, and Soil Nailing to the car park and nursery
retaining walls.

 

Beginning on the 3rd August, Aarsleff drilled 109no vertical bores
on a radial grid including casing under the school building with
its Boart and Klemm 806 rigs. Aarsleff then mixed and injected
OPC/PFA grout to the 4500m2 area ensuring that any surface
instability due to the shallow workings, was eliminated.

 

Aarsleff’s second remit of work included the design and
installation of soil nails which followed a top down construction
with a soil nail spacing of 1.5mX1.5m. Prior to the main works,
suitability tests of 4no positions took place to confirm the ultimate
bond stress used in the design. To facilitate the car park’s
retaining wall, Aarsleff employed its Boart AJ18 rig to install 105no
soil nails of 5.5m average length to the 205m2 vertical wall area.
For the nursery retaining wall, Aarsleff installed 64no soil nails of
approximately 5m in length to the 115m2 vertical wall area. Each
of the R32-280 galvanised epoxy coated bars were fitted with a
head plate and face cladded with a stone filled mesh basket using
local stone to blend with the existing stonework of the area.
Acceptance testing of 2 nails randomly selected from each wall
was undertaken concurrently with the main works to confirm
satisfactory performance at working load.

 

Aarsleff’s final remit of work included the driven steel tube
piling. Aarsleff utilised its Junttan PM20 rig to drive 411no thick
walled steel tube piles of varying lengths between 3m and 14m.
Aarsleff also carried out dynamic proof load testing and vibration
monitoring during the works. Soil Nailing and Piling works were
completed on the 13th October 2017.

 

Managing Director Chris Primett said “Working on Shakespeare
School is another great project to add to our growing portfolio of
educational builds and is testimony to the company’s technical
competence and expertise in delivering a multitude of ground
engineering services on one site. To be awarded the Drilling and
Grouting, Soil Nails and Piling works for this scheme is a huge
acknowledgement in our package solutions and our ability to
tailor our services to meet our client’s needs.”

 

Aarsleff Ground Engineering Manager Dave Evans said:
“This project had its challenges. The site had up to 10 vehicle
movements at any one time from other associated contractors
leading to the requirement of daily detailed planning meetings”.

Download
Case Study

A leading UK ground engineering specialist, focusing on multi-discipline excellence and value engineering. We design and deliver some of the UK’s largest ground engineering projects.

Our vision is to bring confidence to those constructing the landscape of tomorrow .

1947. Central Jutland, Denmark. Per Aarsleff borrowed 10,000 Danish Kroner from his father’s life insurance, bought an excavator, and founded Northern Europe’s leading contracting company.

Our biggest asset, our team is composed of the leading experts in ground engineering. Working with collaboration and cohesion at the core of our business, we can guarantee a quick and founded answer to all your questions.

We recruit and reward our people based on our ‘Step into the Blue’ company culture, where we embrace the core values of Life and Health, Trust, and Responsibility.

We do everything to ensure our team and yours work safely on our sites. With our core value of Life & Health, we see safety as a cultural pillar.

Our ISO accreditations are an assurance to you that we take governance seriously. Read our policies to discover more.

The projects that keep society running. Bridges, buildings, transit and rail facilities, embankment support, marine and offshore facilities, mines, airports, and water projects.

Keeping things turning. Sewage Treatment Works, Waste Water Treatment Works, Wind Farms and Wind Turbines, Biomass Plants, and Power stations.

Meeting society’s needs. Nursing and care homes, MOD buildings, Schools and Universities, and small or large-sized residential developments.

Staying on the move. Remediation, bridges, and foundation work are integral to keeping the industry running smoothly.

The landscape of the marketplace. Mega-retail sheds, distribution warehouses, University accommodation, and major supermarket and household name units.

Keeping things afloat. Ports and harbours, coastal defences, river embankments and inland waterways.