Swinton Project

PILES AND PRE-CAST FOUNDATION SOLUTION FOR 18 SEMI-DETACHED AND TERRACE HOUSES

Concrete foundations for houses made using square piles and pre-cast ground beams.

Project Description

Data: 197 x 200mm Square Piles & 589 Linear meters of 400mm x 400mm pre-cast ground beams

Client: Winworth Construction

Challenges: Site situated in an area of peat with a high water table

The Swinton site posed significant challenges for traditional construction methods due to its location on peat land with a high-water table. The conditions would make it extremely difficult, if not impossible, to construct the prescribed in-situ reinforced concrete foundations. The issue was exacerbated by the need to stay above the flood plain level, further complicating foundation design.

Aarsleff and Capitaline offered Winworth Construction a value-engineered solution involving piles and pre-cast grounds beams. This approach allowed the construction to proceed efficiently, despite the site’s challenging ground conditions.

The use of piles and pre-cast ground beams enabled the project to stay above the flood plain, bypassing the difficulties posed by the soft, waterlogged ground.

Discover more by downloading the full case study.

 

Download
Case Study
Concrete foundations for houses made using square piles and pre-cast ground beams.
A construction site with square concrete piles sticking out of the water. Tress can be seen the background.