North Shields Metro Bridge

DESIGN EFFICIENCY AND OPERATIONAL EXCELLENCE CREATES PROGRAMME SAVINGS ON NIGHT SHIFT PROJECT

Project Description

Data  9 GU8 sheet piles 
Client  G&B Civil Engineering
Type of contract  Design and build contract
Construction period  January 2024

Continuous improvement to our traffic infrastructure is key to ensuring safe journeys around the country. In January, in North Shields, Aarsleff were contracted by G&B Civil Engineering Ltd to install 9 sheet piles to mitigate potential issues at the Metro Bridge. The works were carried out at night under limited possession to reduce impact on the surrounding area, including a nearby industrial facility.

In total, 9 GU8 sheet piles were installed at 8m lengths with a Movax operating on rubber mats. Designed in-house by Aarsleff’s experienced design engineers, the solution was based on the lightest possible section size to ensure minimal vibration occurred during installation of the piles. This also helped to reduce the overall programme of the works, which were carried out over 2 night shifts.

One of the key factors of the project was the need to work night shifts and the optimisation of the time around this. By utilising the conditions of the possession carefully, we were able to carry out all ancillary activities outside of the possession timeframe to allow for quick and effective operations once piling could begin. Mobilisation, site inductions, all plant maintenance, and rig setup were completed before the possession commenced, and so when piling could begin, we were able to work efficiently. This combined with the design savings reduced the overall programme of the project from 5 night shifts, down to 2.

Speaking on the project, Zohaib Khan, Project Manager, said, “The delivery team played a crucial role in adhering and effectively utilising the restrictions of the possession. Due to optimising on the logistics and planning with careful provisions, Aarsleff made huge savings on programme by completing the works in only 2 night shifts.”

By reducing the overall programme of the project, Aarsleff has allowed G&B Civil Engineering to commence their follow on works ahead of their overall programme, delivering value to the end client. This combination of effective design and efficient operations is the type of operational excellence Aarsleff strives for in all we do, delivering real value savings for our clients. 

Download
Case Study

A leading UK ground engineering specialist, focusing on multi-discipline excellence and value engineering. We design and deliver some of the UK’s largest ground engineering projects.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

Our vision is to bring confidence to those constructing the landscape of tomorrow .

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

1947. Central Jutland, Denmark. Per Aarsleff borrowed 10,000 Danish Kroner from his father’s life insurance, bought an excavator, and founded Northern Europe’s leading contracting company.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

Our biggest asset, our team is composed of the leading experts in ground engineering. Working with collaboration and cohesion at the core of our business, we can guarantee a quick and founded answer to all your questions.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

We recruit and reward our people based on our ‘Step into the Blue’ company culture, where we embrace the core values of Life and Health, Trust, and Responsibility.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

We do everything to ensure our team and yours work safely on our sites. With our core value of Life & Health, we see safety as a cultural pillar.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

Our ISO accreditations are an assurance to you that we take governance seriously. Read our policies to discover more.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

The projects that keep society running. Bridges, buildings, transit and rail facilities, embankment support, marine and offshore facilities, mines, airports, and water projects.

Close-up view of steel reinforcement cages at a construction site. A yellow KLEMM drilling rig is in the background.

Keeping things turning. Sewage Treatment Works, Waste Water Treatment Works, Wind Farms and Wind Turbines, Biomass Plants, and Power stations.

An Aarsleff Junttan PM 20HLC piling rig in operation with two workers present. Another piling rig can be seen in the background.

Meeting society’s needs. Nursing and care homes, MOD buildings, Schools and Universities, and small or large-sized residential developments.

Three piling rigs positioned on a muddy site under a blue sky. Construction workers are seen near the rigs.

Staying on the move. Remediation, bridges, and foundation work are integral to keeping the industry running smoothly.

Aarsleff worker kneeing down on one knee with a yellow piling rig and concrete piles in the background. The worker is wearing high-visibility clothing and a white hard hat.

The landscape of the marketplace. Mega-retail sheds, distribution warehouses, University accommodation, and major supermarket and household name units.

Commercial piling projects

Keeping things afloat. Ports and harbours, coastal defences, river embankments and inland waterways.

An aerial view of the Port of Hanstholm.