OVER 1000 PRECAST PILES INSTALLED THROUGH COMPLEX GEOLOGY AND WINTER WEATHER
Project Description
Data: 1070 no. 200/250mm sq Driven Precast Piles
Client: Vistry Homes
Challenges: Complex ground conditions and winter weather
Aarsleff Ground Engineering was engaged by Vistry Homes to deliver the supply and installation of 1,070 precast concrete piles for a new housing development at Martello Lakes. The works commenced on 17th February and were completed by 1st May, with the team working through challenging winter conditions to maintain progress and safety on site.
The piling solution involved 200mm and 250mm square driven precast concrete piles. These were selected to suit the ground conditions and structural requirements of the development. The site is underlain by the Tunbridge Wells Sand Formation, a complex geological unit comprising layered fine to medium sandstones, silty sands, siltstones, and thin mudstones. In some areas, the Grinstead Clay is present between layers. Aarsleff’s understanding of this formation enabled the team to apply value engineering principles, optimising pile lengths and installation methods to reduce programme duration and material use.
Find out more by downloading the full case study.
Related Projects
Please enter your details to download this document
The Latest. News, podcasts & projects
A leading UK ground engineering specialist, focusing on multi-discipline excellence and value engineering. We design and deliver some of the UK’s largest ground engineering projects.
Our vision is to bring confidence to those constructing the landscape of tomorrow .
1947. Central Jutland, Denmark. Per Aarsleff borrowed 10,000 Danish Kroner from his father’s life insurance, bought an excavator, and founded Northern Europe’s leading contracting company.
Our biggest asset, our team is composed of the leading experts in ground engineering. Working with collaboration and cohesion at the core of our business, we can guarantee a quick and founded answer to all your questions.
We recruit and reward our people based on our ‘Step into the Blue’ company culture, where we embrace the core values of Life and Health, Trust, and Responsibility.
We do everything to ensure our team and yours work safely on our sites. With our core value of Life & Health, we see safety as a cultural pillar.
Our ISO accreditations are an assurance to you that we take governance seriously. Read our policies to discover more.
The projects that keep society running. Bridges, buildings, transit and rail facilities, embankment support, marine and offshore facilities, mines, airports, and water projects.
Keeping things turning. Sewage Treatment Works, Waste Water Treatment Works, Wind Farms and Wind Turbines, Biomass Plants, and Power stations.
Meeting society’s needs. Nursing and care homes, MOD buildings, Schools and Universities, and small or large-sized residential developments.
Staying on the move. Remediation, bridges, and foundation work are integral to keeping the industry running smoothly.
The landscape of the marketplace. Mega-retail sheds, distribution warehouses, University accommodation, and major supermarket and household name units.
Keeping things afloat. Ports and harbours, coastal defences, river embankments and inland waterways.