Stockport

WELL-ROUNDED DESIGN SUPPORT CREATES AN EFFECTIVE AND EFFICIENT SOLUTION FOR NEW RESIDENTIAL STRUCTURE

A sheet pile wall being installed by two Aarsleff workers using a pile driving rig. One worker is standing near the rig and use his hand to guide.

Project Description

SCOPE OF WORKS: 143m of sheet pile wall from 3-9m

CLIENT: Hargreaves Contracting Limited

CONTRACT: Design and build

CONSTRUCTION PERIOD: June – July 2023

Aarsleff were contracted to install 143m of sheet piling for a new residential structure in Stockport, near Manchester. On the site of a former car wash, the development plans to create 73 one- and two-bedroom apartments and will aim to create affordable housing for local residents.

The provided cross sections of the building and proposed layout of the sheet pile wall were complex and meant our engineers needed to dedicate time to more deeply understand the scheme through conversations with our client and site visits.

It was initially proposed that the sheets be driven using a Movax attachment to an excavator, which is effective in soils of low to medium strength. Borehole investigations indicated a hard stratum of sandstone at 7.9m below ground level. To ensure the most efficient delivery, it was identified that designed pile toe level must be above this 7.9m level, which our design engineers achieved through an effective and economic design.

Discover more by downloading the full case study.