South Kirkby Waste Management Facility

DRIVING OF PRECAST PILES FOR A NEW WASTE MANAGEMENT FACILITY

Project Description

SCOPE OF WORKS: 1071 No. 250mm square precast reinforced concrete piles, 20 No. 300mm square precast reinforced concrete piles

CLIENT: Shanks Group Plc and Wakefield City Council

CONTRACTOR: Kier Construction Ltd

EQUIPMENT: 1 Banut 200, 1 Junttan PN20

CONSTRUCTION PERIOD:  November 2013 – December 2013

Bringing lots of much needed jobs to the area, the residual waste treatment facility at South Kirkby, Yorkshire, which includes an autoclave-assisted anaerobic digestion plant, is designed undertake recycling and composting, as well as having refuse-derived fuel capabilities.

The £80 million waste treatment plant forms part of an estimated £750 million waste management PFI contract, signed between Shanks Group plc and Wakefield City Council. At capacity the facility will process up to 230,000 tonnes per annum of municipal
solid waste, which will help to increase the local authority’s landfill diversion rate towards 90%.

Aarsleff was appointed by contractor Kier Construction Ltd, to undertake the foundation work, including dynamic testing, for the plant’s state-of-the-art Autoclave. The Autoclave is a critical part of the waste facility, as it is used to sterilise organic material that cannot be separated out and recycled before being fed into the 65,000 tonnes per annum anaerobic digestion plant, which produces biogas for renewable energy generation.

Aarsleff designed and installed 1091 piles to support ten tanks, which will hold the organic waste, as well the building housing the Autoclave itself. The piles were driven into mudstone. Specifically, some 1071 precast concrete reinforced piles, measuring 250mm sq. and 18, measuring 300mm sq. were installed in lengths of between 7 and 9m. All piles were supplied and manufactured by Centrum, Aarsleff’s wholly owned subsidiary based in Newark, Nottinghamshire.

The eight-week project commenced in November 2013 and the piles were installed using Aarsleff’s own Banut 700 and Junttan PN20 piling rigs for phase 1 and phase 2 of the project respectively. Commenting on the installation Project Manager Dan Broadly said, “This was quite a substantial and high profile project and was completed on-time and within budget with no delays.”

Chris Scarr, Sub Agent Kier Infrastructure, speaking of Aarleff’s involvement on the project commented, “Aarsleff were employed as a subcontractor on the Wakefield Waste Project at South Kirkby to supply and install 906 pre-cast driven piles to two areas
on site, within a seven-week period. They completed the works seven days ahead of their scheduled date, in spite of an initial delay due to design testing requirements. Then, due to a design change to one of the areas of the project, Kier instructed Aarsleff
to manufacture and install an additional 185 piles, which they did in just over three weeks from receiving the design information – almost two weeks quicker than our original planned duration for the works.

“We found Aarsleff’s’ management and site operatives easy to work with and very efficient with regards to design, installation and testing. Overall working with Aarsleff was a stress free and pleasant experience and I would definitely consider them again for future works.”

Download
Case Study
piling rig

A leading UK ground engineering specialist, focusing on multi-discipline excellence and value engineering. We design and deliver some of the UK’s largest ground engineering projects.

Our vision is to bring confidence to those constructing the landscape of tomorrow .

1947. Central Jutland, Denmark. Per Aarsleff borrowed 10,000 Danish Kroner from his father’s life insurance, bought an excavator, and founded Northern Europe’s leading contracting company.

Our biggest asset, our team is composed of the leading experts in ground engineering. Working with collaboration and cohesion at the core of our business, we can guarantee a quick and founded answer to all your questions.

We recruit and reward our people based on our ‘Step into the Blue’ company culture, where we embrace the core values of Life and Health, Trust, and Responsibility.

We do everything to ensure our team and yours work safely on our sites. With our core value of Life & Health, we see safety as a cultural pillar.

Our ISO accreditations are an assurance to you that we take governance seriously. Read our policies to discover more.

The projects that keep society running. Bridges, buildings, transit and rail facilities, embankment support, marine and offshore facilities, mines, airports, and water projects.

Keeping things turning. Sewage Treatment Works, Waste Water Treatment Works, Wind Farms and Wind Turbines, Biomass Plants, and Power stations.

Meeting society’s needs. Nursing and care homes, MOD buildings, Schools and Universities, and small or large-sized residential developments.

Staying on the move. Remediation, bridges, and foundation work are integral to keeping the industry running smoothly.

The landscape of the marketplace. Mega-retail sheds, distribution warehouses, University accommodation, and major supermarket and household name units.

Keeping things afloat. Ports and harbours, coastal defences, river embankments and inland waterways.