DRIVING OF STEEL SHEET PILES TO UPGRADE A17 EMBANKMENT

A worker wearing a orange Aarsleff hi-vis jacket and PPE stands in front of sheet piles being installed. The sun shines brightly between the sheet piles.

Project Description

Scope of works   413 No. Steel Sheet Piles
Client  Lincolnshire County Council
Contractor  Eurovia UK
Construction period  8th January – 9th February 2018

Lincolnshire County Council recently commenced work on its £2.4M valued A17 Sleaford Bypass Embankment Repairs Scheme, part of which involves a complex section of slope stabilisation as the dual carriageway crosses over both the London and North Eastern Railway and East Midlands Trains’ Peterborough-Lincoln Line.

The scheme, which is being funded using part of the £5.4M allocated to the authority by the Department of Transport

(DfT) from its National Productivity Investment Fund to help reduce congestion at key locations and upgrade or improve the maintenance of local highway assets, was awarded to Eurovia Contracting, who are the civil engineering company and construction division of Vinci group company, Eurovia UK.

The scheme has involved a series of sheet piling which has seen the geotechnical subcontract awarded to Aarsleff Ground Engineering, who worked on the embankment opposite the A153 overbridge and the railway bridge to install 413 No. steel sheet piles using their Movax rig to form a retaining a wall.

“The local authority are not only replacing and repairing what is currently an outdated drainage system to ensure rainwater is properly channelled away from the bank to where it should be discharged”, explained one of Aarsleff’s Piling Foreman, Darren Robertson.

“They are also protecting the embankment from slippage over the coming years by not only using steel sheet piles, but by installing soil nails to stabilise the remainder of the embankment”.

Download
Case Study

A leading UK ground engineering specialist, focusing on multi-discipline excellence and value engineering. We design and deliver some of the UK’s largest ground engineering projects.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

Our vision is to bring confidence to those constructing the landscape of tomorrow .

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

1947. Central Jutland, Denmark. Per Aarsleff borrowed 10,000 Danish Kroner from his father’s life insurance, bought an excavator, and founded Northern Europe’s leading contracting company.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

Our biggest asset, our team is composed of the leading experts in ground engineering. Working with collaboration and cohesion at the core of our business, we can guarantee a quick and founded answer to all your questions.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

We recruit and reward our people based on our ‘Step into the Blue’ company culture, where we embrace the core values of Life and Health, Trust, and Responsibility.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

We do everything to ensure our team and yours work safely on our sites. With our core value of Life & Health, we see safety as a cultural pillar.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

Our ISO accreditations are an assurance to you that we take governance seriously. Read our policies to discover more.

An Aarsleff construction worker wearing a high-visibility jacket and hard hat on a site.

The projects that keep society running. Bridges, buildings, transit and rail facilities, embankment support, marine and offshore facilities, mines, airports, and water projects.

Close-up view of steel reinforcement cages at a construction site. A yellow KLEMM drilling rig is in the background.

Keeping things turning. Sewage Treatment Works, Waste Water Treatment Works, Wind Farms and Wind Turbines, Biomass Plants, and Power stations.

Aarsleff's Junttan PM 20HLC piling rig in operation with two workers present. Another piling rig can be seen in the background.

Meeting society’s needs. Nursing and care homes, MOD buildings, Schools and Universities, and small or large-sized residential developments.

Three piling rigs positioned on a muddy site under a blue sky. Construction workers are seen near the rigs.

Staying on the move. Remediation, bridges, and foundation work are integral to keeping the industry running smoothly.

Aarsleff worker kneeing down on one knee with a yellow piling rig and concrete piles in the background. The worker is wearing high-visibility clothing and a white hard hat.

The landscape of the marketplace. Mega-retail sheds, distribution warehouses, University accommodation, and major supermarket and household name units.

Commercial piling projects

Keeping things afloat. Ports and harbours, coastal defences, river embankments and inland waterways.

An aerial view of the Port of Hanstholm.