AARSLEFF’S MULTIDISCIPLINE CAPABILITIES ADDS VALUE FOR CLIENT IN THE WEST MIDLANDS
Project Description
SCOPE OF WORKS: Remove existing failed timber retaining wall
Carry out excavation works
73l/m of King Post Wall with reinforced concrete panels with vibratory side grip pile driving vibratory hammer attachment
Installation of a drainpipe behind the KPW
CLIENT: DES Build
CONTRACT: Design and build
CONSTRUCTION PERIOD: July 2023
In July 2023, Aarsleff mobilised to site in Erdington, Birmingham to implement a scheme to replace a failed timber retaining wall on site. Working for DES Build, Aarsleff were able to not only install a new king post wall system to ensure the stability of the site but all enabling and delivery works as well which provided flexibility and savings to the client.
By engaging early with Aarsleff, our client benefitted from value-engineering. We optimised the span by adjusting the backfill material level which meant through effective operations and design coordination, we were also successfully and safely able to bridge across live services. Our design engineers not only created a detailed king post wall design but also carried out slope stability analysis, allowing for in-depth understanding of site by all parties.