Piling contractor, Aarsleff Ground Engineering, presents a throwback to December 2010 when Aarsleff Ground Engineering delivered a driven pile foundation solution to support two 2MW Wind Turbines.
Triodos Renewables awarded Carter Civils, under competitive tender, the contract for the 4MW…
Aarsleff Ground Engineering was awarded the piling contract on behalf of the main contractor Costain Ltd for a new temporary precast concrete batching plant and manufacturing facility in development with the construction of the Hinkley Point C power station. The…
Driven Piling at Newhaven Port
Contractor Raymond Brown Construction awarded Aarsleff Ground Engineering the foundations contract to supply, design and install the driven precast and steel tube piling for a new 60,000 litre fuel tank base in Newhaven Port, East…
Aarsleff Ground Engineering has completed the foundations contract for the Newark wind farm in Hawton, Newark-on-Trent.
Main contractor RG Carter Civil Engineering has subcontracted to Aarsleff the installation of 54 piles for each of the three turbines to be erected,…
Aarsleff Ground Engineering were awarded the piling works from main contractor Galliford Try PLC. The project will form part of a new Bio-Mass energy facility located on land leased from Associated British Ports (ABP) in the vicinity of King George…
Scotland Piling Contractor at the Dunmaglass Windfarm
Aarsleff Ground Engineering were awarded the piling contract for one of the UK mainland’s highest onshore wind farms for contractors R J Mcleod Ltd. Because of its geographical position, Dunmaglass (based in Scotland)…
The London Array Offshore Wind Farm is located more than 20km (12 miles) off the coasts of Kent and Essex in the outer Thames Estuary in a strategic area the UK Government has identified for offshore wind farm development.
The…