Installing a cofferdam for a new outfall structure into the off Water Lane in Newark.
Aarsleff Ground Engineering have completed on site installing and extracting a sheet piled cofferdam on Water Lane in Newark, as part of waste and water…
Sheet Piling for a Cofferdam in Stourport, as part of the Birmingham Resilience Scheme
J Murphy Group awarded Aarsleff the contract to install a temporary sheet piled cofferdam on the River Severn, as part of the £300 Million ‘Birmingham Resilience’…
Sheet piles are used on schemes large and small, from simple projects to complex slope stabilisation solutions. They may be designed to both retain temporary excavations and to act as the permanent retaining structure, often in conjunction with the base…
Contiguous pile walls are installed using rotary bored or CFA techniques, often used in permanent applications. This type of retaining wall is constructed with close spaces between adjacent piles (1.1 to 2 piles diameters apart) and are used on a…
Structure Anchors are designed to support structures, most commonly used in geotechnical and construction applications. Ground Anchors give strength to a new or existing structure. A small diameter bar or tendon is drilled through the face of the wall and…
What are Ground Anchors used for?
Ground anchors can carry very high loads to hold down/ up/ back structures/slopes. The main purpose of geotechnical ground anchors is to prevent horizontal movement, while stabilising retaining structures, including sheet pile, bored concrete…
Sheet piled cofferdam installed in Stourport as part of the Birmingham Resilience Scheme for Supply chain partner J Murphy Group. J Murphy Group awarded Aarsleff Ground Engineering the contract to install a temporary sheet piled cofferdam on the river Severn,…