Welcome to the Site Operatives page, providing you with all the latest messages and information straight from the source. Specifically designed for our valued site engineers and operatives, make sure to regularly check-in for the latest updates.

25.08.2021

Project Award! 🏆

Additional Works @ Ward End Park Road, Washwood Heath

Re-drive 128nr sheet piles to final level with Movax

For Jessup Brothers

Start on site 13th September

25.08.2021

Project Award! 🏆

POAO Building B2, Portsmouth

37lin.m Permanent DSS – GU8N 6m installed with Movax + steel capping beam

For Kier Southern

Start on site tbc

25.08.2021

Project Award! 🏆

New Monks Farm (A27 Link road) – Piling

For Buckingham Group

Start on site tbc

24.08.2021

Project Award! 🏆

Newton Aycliffe

PWS, Newton Aycliffe, Durham

For Meldrum Group

Start on site 4th October

24.08.2021

Project Award! 🏆

307 Lin/m King Post Wall with PCC Panel infill

c£360,000.00 @ 20% (to be finalised during detailed design

For Beal Developments

Start on site October

20.08.2021

Project Award! 🏆

Loughborough College

No.98 200mm, driven precast piles

For Novus Solutions

Start on site 11th October

18.08.2021

Project Award! 🏆

King Post Wall, Ossett Healthcare Centre, Wakefield

50.3 Lin/m King Post Wall with Sheet piling infill

For McCarthy and Stone

Start on site 23rd September

18.08.2021

Project Award! 🏆

19lm DSS 1.7m RH

at Herbert Road Phase 3, Newport

For Equans

Start on site TBC

10.08.2
17.08.2021

Project Award! 🏆

50no. 250/300mm, 16m lengths at Kendalls RMX Plant, Portsmouth

For Vision Ground Works

Start on site October

10.08.2021

Project Award! 🏆

Groveport Steel Shed, Scunthorpe

For BH Construction Ltd

Start on site w/c 15 November 2021 for 5 weeks

06.08.2021

Project Award! 🏆

Welwyn Garden City –

Additional Grouting compaction works

For Crest Nicholson

05.08.2021

Project Award! 🏆

Wyberton May Lock Up, Boston

No116 250mm driven precast piles

For HH Adkins

Starts: 18th October

04.08.2021

Project Award! 🏆

Instruction for additional soil nail works on 200166 – Hexham Queen Eilzabeth School.

GEO Est JD

From Thompsons of Prudhoe

03.08.2021

Project Award! 🏆

No.33, 250mm precast piles at Tilbury – Bagging Products Hopper & Packing Area

For KKB Group

Proposed start date: 11th October

03.08.2021

Project Award! 🏆

No.33, 250mm precast piles at Tilbury – Bagging Products Hopper & Packing Area

For KKB Group

Proposed start date: 11th October

02.08.2021

Project Award! 🏆

Pile Order Alyth Substation, Perthshire

For Bam Nuttal

Proposed start date: 11th October

29.07.2021

Project Award! 🏆

No5,585 Driven precast piles at Bristol, Amazon BRS8

For TSL Projects

Proposed start date: September 13th

29.07.2021

Dear all,

Please find attached a general communication from the UK.

https://aarsleff.co.uk/wp-content/uploads/2021/07/General-Update-23-07-2021.pdf

Please find time to read, reflect and digest.

Thank you for your ongoing focus and commitment, we are entering the final quarter of our trading year in the strongest position we have ever experienced.

Well done all……

27.07.2021

I am delighted to share with you the sixth issue of our EDGE newsletter.

It can be downloaded from the following link

Happy reading!

26.07.2021

130 No 200/250 sq piles n.e 15 at Caxton Road, Frome

For Acorn Housing Construction Solutions

Proposed start date: 27th September

23.07.2021

Parsonage Way, Leigh – Plots 77 – 126

No.56 200mm & No.41 250mm driven precast piles & No.123 178mm DST

For

Tempus Design and Build Ltd

Proposed start date:  6th September

20.07.2021

Coddington CofE – Retaining Wall

24.5 l/m KP wall <1.0m retained height

For ARC Partnership

Proposed start date:  August

20.07.2021

Station Road Ponds, Llanwern Southern Balance Infrastructure – Soil Nails

290no. soil nails & facing.

For Walters Group

Proposed start date: 26th August

16.07.2021

Specialist Retaining Wall at Dukes Meadow Footbridge, Hounslow

For Knights Brown

Proposed start date: Phase I W/c 16th Aug, Phase II & III TBC – Sept onwards

16.07.2021

Pilling at TVE FACILITY, RADWAY GREEN, CHESHIRE

For Caddick construction.

Proposed start date: 27th September

16.07.2021

132lm DSS GU8 & GU13 pile section, rig install & pre-auger

The Mount – Prestwich (additional scope Rev 5 Proposal)

For Bellway Manchester

Proposed start date: 2nd august

15.07.2021

Additional scope for Croda, Hull from Dallol Energy

250mm, 16No. Driven precast piles.

Proposed start date: 20th September

13.07.2021

July / August Staff Newsletter No.26 is now available to download.

Please continue to send your wonderful photos to louisecrawshaw@aarsleff.co.uk

The next issue shall be out September.

https://aarsleff.co.uk/wp-content/uploads/2021/07/Aarsleff-Newsletter-Issue-26.pdf
13.07.2021

Safety Alert

Please ensure that the content of the attached safety alert 109 – Stihl Saw product recall is briefed to all relevant persons.

Where we are using these products please follow the instructions within, immediately.

A signed briefing register must be returned to myself ASAP via whats app or email with the paper briefing register to follow in the post.

https://aarsleff.co.uk/wp-content/uploads/2021/07/109-Immediate-Recall-Stihl-Saw-Product-Recall.pdf
12.07.2021

Project Award! 🏆

26lm DSS 1.0m RH

at Royal Park, Nuneaton

Proposed start date: August TBC

12.07.2021

Project Award! 🏆

250mm, 245 No. Driven precast piles.

at Cambridge City FC – Sawston

Proposed start date: September 2021

08.07.2021

Project Award! 🏆

Drilling and grouting

at Dame Allan School, Fenham, Newcastle

Proposed start date: 16th August

25.06.2021

Project Award! 🏆

48lm DSS – mix GU/VL piles – crane install

at HEP Howley, Warrington for Hydropol

Proposed start date: 12th July

18.06.2021

Project Award! 🏆

387m non-structural capping beam at Fradley Park, Litchfield for Winvic.

Proposed start date: TBC

18.06.2021

Safety Alert!

Please ensure that the content of the attached safety alert 108 – Loading & Unloading Safety  that relates to an Aarsleff RIDDOR reportable (+7 day accident) where a lorry driver fractured two fingers during a loading operation.

A signed briefing register must be returned to myself ASAP via whats app or email with the paper briefing register to follow in the post.

The detail within shall be adopted into all company loading and unloading operations.

Download here

17.06.2021

Project Award! 🏆

73No. 200mm Driven precast piles at Dutch Barn – Kings Lynn for Britcon Ltd.

Proposed start date: August

16.06.2021

Project Award! 🏆

89.4lm DSS with Internal Bracing at Dutton Weir, Acton Bridge for Hydropol

Proposed start date: 5th July

11.06.2021

Project Award! 🏆

30No. 200mm & 12No. 300mm & 3No. 250mm Driven precast piles at Osgodby Primary School, Market Rasen

For John Martin-Hoyes Ltd

Proposed start date: 26th July

11.06.2021

Project Award! 🏆

Compaction Grouting – Bessemer Road, Welwyn Garden City

For Crest Nicholson Ltd

Proposed start date: early July

08.06.2021

Project Award! 🏆

48.5lin.m DSS for 3.2m retained height at Polegate Yard, Hailsham for Haulaway Ltd

Proposed start date: w/c 12th July

07.06.2021

Project Award! 🏆

King Post Wall and Tieback Anchors at Castleton Co-Op

Proposed start date: w/c 14th June

03.06.2021

Project Award! 🏆

No.57 250mm driven precast piles

at Mars Street, Armacell, Oldham for Seymour Ltd

Proposed start date: w/c 23rd August.

03.06.2021

Project Award! 🏆

No.12 300mm driven precast piles

at Lowdham Leisure World Extension for A & S Enterprises Ltd.

Proposed start date: w/c 14th June

28.05.2021

Project Award! 🏆

420m KPW with DSS Infills for 1.2-2.6m retained height

at Fradley Park, Litchfield for Winvic.

Proposed start date: w/c 5th July 2021 (4-5 weeks incl pre-auger)

28.05.2021

Dear all, the monthly report for April is now available to download 

28.05.2021

Project Award! 🏆

62no. 300mm diameter CFA piles – Klemm 709 install

at Church Hill Street, Smethwick for 4 House Development at Katrine, Olney, Bucks.

Proposed start date:  tbc

28.05.2021

Project Award! 🏆

123m DSS for 2.0-3.6m retained height

at Church Hill Street, Smethwick for Harper Group Construction Limited.

Proposed start date:  5th July. 

28.05.2021

Project Award! 🏆

156m KPW for 1.0-3.0m retained height

at Crystal Drive, Smethwick for Glencar.

Proposed start date:  20th July. 

25.05.2021

Project Award! 🏆

8No. 200mm, Precast driven concrete piles at Wincanton WRC, Somerset for Wessex Water

Proposed start date:  7th June.

25.05.2021

Project Award! 🏆

22No. 244mm, Precast driven concrete piles at Celsa, Roiver Way, Cardiff for Tercon Ltd.

Proposed start date:  28th June.

24.05.2021

Project Award! 🏆

30m DSS Movax 2m retained height at Dartford Project X for Glencar.

Proposed start date:  asap.

24.05.2021

Project Award! 🏆

331 No precast piles at Nar Ouse Enterprise Zone Phase 1 for R G carter Ltd.

Proposed start date:  23rd August. 

20.05.2021
24.05.2021

Project Award! 🏆

270 No 339mm dia DST 24m Length

at Stobart Widnes Port – Gantry Crane for SJP Group.

Proposed start date:  21st June

20.05.2021

We are currently reviewing the rewards we offer across the business and would like to collate some feedback from yourselves about your thoughts and opinions.

We would like to get as many responses as possible and would appreciate if you can complete the survey on the below link – managers, please pass these on to your team members.

https://lp.constantcontactpages.com/sv/WMWZbLz/rewardsurvey

As a thank you for completing the survey, there are two £25 prizes available. To enter the draw you will need to submit your name at the end of the survey.

We are giving all colleagues two weeks to complete the survey – the survey will close on Tuesday 1 June, close of play.

Thank you for your participation and good luck in the prize draw!

Kind regards,

13.05.2021

Project Award! 🏆

40no. GU16n Sheet Piles – Approx. 24 Lin/m

at Weardale Suite, Durham University for G&B Civil Engineering

Proposed start date:  tbc July

12.05.2021

Project Award! 🏆

No164 200mm Driven precast piles at Wallsend Integrated Care Hub for Esh Construction.

Proposed start date:  19th July

10.05.2021

Project Award! 🏆

66lm KPW for up to 5.5m retained height – DTHH Installation

At Speke Road, Liverpool for DASC Construction.

Proposed start date:  17th-May

10.05.2021

Project Award! 🏆

72lin/m temp DSS

Install 1.5 weeks with extraction still the same. At 110 Buckingham Avenue, Slough – Sheet piling works for Farncombe Construction.

Proposed start date:  17th-May

06.05.2021

The May/ June Staff Newsletter, Issue No.25 is now available to download.

Please continue to send your wonderful photos to louisecrawshaw@aarsleff.co.uk

The next issue shall be out w/c 5th July

04.05.2021

Project Award! 🏆

108No. 300mm precast piles at South Shields – Port of Tyne Authority for Southbay Civil Engineering Ltd.

Proposed start date:  26th July for 1.5 weeks

04.05.2021

Project Award! 🏆

21m KPW for 2.0m RH at Billinghurst, for Landbuild Ltd.

Proposed start date:  Mid-June

30.04.2021

Monthly Round Up March 2021

22.04.2021

Project Award! 🏆

123.6Lin.m Temp DSS, GU16N 9m installed with rig, pre-auger prior. Extraction 2 weeks later at Slough, Buckingham Avenue, for Farncombe Construction.

Proposed start date:  24th May

21.04.2021

Project Award! 🏆

85m DSS 2.5mRH using ZZ piles, Rochdale Riverside, for Willmott Dixon

Proposed start date:  1st June

21.04.2021

Project Award! 🏆

124No 339 DST piles at Forterra Desford, Coalville – Clay Storage Building and Conveyor Bases, for Buckingham’s

Proposed start date:  14th June

21.04.2021

Project Award! 🏆

1408No 200mm, 132No 250mm &  71No 300mm precast piles at Bolton – Lynstock House , for Raynor Rowan.

Proposed start date:  14th June

20.04.2021

Project Award! 🏆

233No 350mm diameter x 8m Length (CFA- SF50) at Melksham, Hunters Wood, for David Wilson Homes.

Proposed start date:  17th May

20.4.2021

Download the April issue of the One Magazine here

14.04.2021

Project Award! 🏆

85.2Lin.m Permanent DSS, GU16N 7m installed with Movax at Ward End Park Road, Washwood Heath, for Jessup Brothers.

Proposed start date: 10th May

13.04.2021

Project Feedback!

Please find below outstanding feedback for the king post retaining wall project at Hythe Hospital

Click here

09.04.2021

Project Award! 🏆

5066No. precast piles at Avonmouth, Central Park Phase 2, for ISG PLC.

Proposed start date:  14th June

09.04.2021

Project Award! 🏆

65m DSS – 8m GU8s – MOVAX at Purfleet, Stonehouse Ditch Culvert, for S Walsh & Sons Ltd.

Proposed start date:  26th April

06.04.2021

Project Award! 🏆

896No. 200mm precast piles at Cranswick, Hull, for Trundley Ltd.

Proposed start date:  3rd May

08.4.2021

Download the latest group newsletter here, detailing activity from across our ground engineering segment in northern Europe.

06.04.2021

Project Award! 🏆

Drilling and Grouting work at School Street, Radcliffe, for LK Remediation.

Proposed start date:  3rd May

01.04.2021

Project Award! 🏆

977.4m2 PERMANENT DSS + 886.8m2 TEMPORARY DSS

Mix of GU27N & GU32-0.5 – 8m to 13m

Crane suspended installation with vibro & impact hammer

at, HEP Irlam Lock for Hydropol.

Proposed start date:  15th April

30.03.2021

Project Award! 🏆

180No. 200mm precast piles at Barratt Homes, Phase 1, Longridge, Preston, for Franki Foundations.

Proposed start date:  6th April

29.03.2021

STEQ MESSAGE

The attached safety alert has been produced following a spate of accidents and incidents which have not been reported in a timely manner

Please ensure the content of this Safety Alert – 105 – Reporting of Accidents & Incident Near Miss Reporting is briefed to all Site Operatives, Plant Fitters and Centrum Operative

A signed briefing register must be returned directly to the STEQ department

Safety alert download

29.03.2021

Project Award! 🏆

103No. 250mm precast piles at Grimsby, Ashby Cum Fenby, for Jembuild Ltd.

Proposed start date:  26th April

29.03.2021

Project Award! 🏆

377No. 250mm precast piles at Persimmon parcel, for Persimmon Homes.

Proposed start date:  7th June

29.03.2021

Project Award! 🏆

Emergency anchor works at Castleton Co-op, Hull for Kapex Construction.

Proposed start date:  TBC

26.03.2021

Monthly Round Up Feb 2021

26.03.2021

Project Award! 🏆

220No. 250mm precast piles at Croda Extension Project, Hull for Dallol Energy Ltd.

Proposed start date:  April 19th

26.03.2021

Project Award! 🏆

98lm DSS for retained height 1.77 – 3.83m, GU13 to GU20 pile section & movax installation at the Mount Prestwich for Bellway Manchester.

Proposed start date:  April 26th

26.03.2021

Project Award! 🏆

81lm DSS for retained height 0.65-2.70m & 41lm KPW for retained height <1.0m at Tonbridge Trade Park, Vale Rd. for Glencar

Proposed start date:  May 10th

26.03.2021

Project Award! 🏆

42m KPW to client design at Witham Station Trackside Car Park

Proposed start date: Early May TBC

Project Award! 🏆

180No. 250mm piles – Additional works at North Chippenham.

Start on site w/c 19 April for 1.5 weeks – Banut 300

25.03.2021

Project Award! 🏆

112 No. driven UC post for acoustic fence (by others) with a Movax at Norwood Road, Newcastle

W/c 19th April or thereabouts

Project Award! 🏆

20m King Post Wall with horizontal sheet pile infill panels at Atkinson Terrace – Wallsend

+ Drilled & concreted 600mm diameter bore max 3m c/c.

Start on site 12th April.

17.03.2021

Project Award! 🏆

24lm KPW for retained height 3.4m at Hollymoor way, Rubery, for Amphion Construction

Work starts TBC

15.03.2021

Project Award! 🏆

No.334 200mm Precast Piles at Faversham Lakes, for Anderson Group.

Work starts on w/c 19th April, for 3 weeks.

12.03.2021

Safety Alert

Please ensure that the content of the attached safety alert 104 – rig interlocks & damage incident is briefed first thing Monday morning 15th March and a signed briefing register returned to Robert Speakman ASAP via whats app or email.

Whilst the specifics may not exactly fit your worksite activity the principle of not defeating safety equipment, maintaining safety equipment and timely reporting of incidents and supervisory / line management checks are relevant across all areas of the business.

12.03.2021

Project Award! 🏆

54lm DSS for retained height 1.5-4.5m at Park View School, Prestwich for HH Smiths & Sons Ltd.

Work starts w/c 12th July

12.03.2021

Project Award! 🏆

No.237 10mm Steel, 200mm at Cowbit Road, Spalding for SPEEDECK

Work starts w/c 12th July

10.03.2021

Project Award! 🏆

North  20No. 250mm  & South 20No. 250mm at Bristol Hartcliffe Way for Encon

Work starts w/c 29th March

10.03.2021

Project Award! 🏆

93lm KPW for retained height 1.3m at Stone Cross Park, for Caddick Construction Ltd

Work starts 5th April for 1 week.

10.03.2021

Project Award! 🏆

149 l/m KP wall 1.1 – 4.0m retained height at Burton Queens Hospital Car Park for Morgan Sindall.

Work starts 22nd March

10.03.2021

Project Award! 🏆

220No 200mm Driven precast piles at FEZ hub, plot 12, Holbeach for RG Carter Ltd.

Work starts w/c 17th May for 1.5 weeks.

10.03.2021

Project Award! 🏆

122 l/m KP wall 2.45 – 4.64m retained height at Jewsons, Chesterfield for Morgan Sindall.

Work starts Late April/Early May

10.03.2021

Project Award! 🏆

63No 200mm Driven precast piles at Biddenham West Parcel for Vistry.

Work starts w/c 3rd May

10.03.2021

Project Award! 🏆

387No 250mm & 34No. 300mm Driven precast piles at North Yate Local Centre for Barratt Homes Bristol.

Work starts w/c 22nd March for 2.5 weeks

05.03.2021

The March/April Staff Newsletter, Issue No.24 is now available to download.

Please continue to send your wonderful photos to louisecrawshaw@aarsleff.co.uk

The next issue shall be out w/c 3rd May

03.03.2021

Project Award! 🏆

3233 No Piles at Basingstoke, for Winvic.

Proposed start date: June 2021

03.03.2021

Project Award! 🏆

107 No Piles Total lengths ranging from 6-32m at YMCA Hanley, Stoke for Hawk Developments.

Proposed start date: Mid March 2021

03.03.2021

Project Award! 🏆🏆🏆

6,330No Pre Cast Piles at London Gateway – Piling / Project Triathlon for ISG.

Proposed start date: Mid May 2021

03.03.2021

Project Award! 🏆

84lm KPW for retained height 1.0-3.15m at Stoney Croft, Birmingham for Jessup Brothers.

Proposed start date: 5th April 2021 (2 weeks)

02.03.2021

Project Award! 🏆

228lm DSS for retained height 1.0-4.3m at Milton Keynes – Bletcham Way for Glencar

Proposed start date: 4th April 2021 (3 weeks)

02.03.2021

Project Award! 🏆

102No. 250mm precast piles at Port of Boston, Steel Terminal for Daniel Charles Construction Ltd

Start on site w/c 12 April for 1 week

01.03.2021

Project Award! 🏆

MSCP, Sky Studios, Borehamwood for BAM Nuttall Ltd

SOS June 2021

23.02.2021

Project Award! 🏆

46m KPW/DSS combi wall for max retained height 3.0m at Blaydon Beach Green for Keepmoat

End of March 2021

22.02.2021

Project Award! 🏆

10No. 250mm & 449No. 300mm Pre-cast piles at Rochdale Riverside forWilmott Dixon.

Start date w/c 1 March 2021

22.02.2021

Project Award! 🏆

Pre-cast piles at Buckholm Corner, Galashiels,Stanley Brash Construction

Start date w/c 1 March 2021

22.02.2021

Project Award! 🏆

1021 No. 300mm & 361 No. 350mm & 1356 No.250mm  pre-cast piles at Protos EfW, Cheshire for Metka

Start date w/c 12th April 2021

22.02.2021

Project Award! 🏆

6,346 No. 250mm & 422 No. 300mm  pre-cast piles at Lidl Belvedere for TSL

Start date w/c 22 March 2021

19.02.2021

Project Award! 🏆

417 No. 250mm & 101No. 300mm  pre-cast piles at Yatton for Smart systems

Start date w/c 22 Feb 2021

19.02.2021

Project Award! 🏆

138 No. 300mm,  pre-cast piles at Westry, Peterborough for Stortec Engineering Ltd

Start date w/c 22 March 2021 for duration 1.5 working weeks

19.02.2021

Project Award! 🏆

320 no – GU8n at maximum length 7m long and 162m plan length + intermediate sheet pile buttresses + bracing

at M621 Emergency Works, for CR Civil Engineering Ltd

Start date 22nd February 2021

19.02.2021

Project Award! 🏆

101 No. 200mm, 414 No. 250mm and No.122 300mm pre-cast piles at Fitzalan High School, Cardiff , for Kier

Start date April 2021

16.02.2021

Project Award! 🏆

81 No. 200mm pre-cast piles E026 Dev, Port rd, Docks Way, Newport, for JW-G Construction.

Start date 19th April 2021

15.02.2021

Download and read the latest Worksafe Committee Minutes here.

Please ensure you look through these as there are actions for some who may not have been in attendance, if you have any queries please speak to the STEQ team

15.02.2021

Project Award! 🏆

121 No. 200mm &  19No. 250mm diameter pre-cast piles Kingsclere Park

Start date March 2021

09.02.2021

Project Award! 🏆

3,050no piles, 250mm type 4t 12mm bars, 15m length, at Central Park Avonmouth for A&H Construction.

Start on site – 19th April for a duration of 8 weeks / 3 no rigs

08.02.2021

Project Award! 🏆

N0.23, 250mm, precast piles, Costa Coffee at Usk Way, Newport for ISG Retail.

Start date March 22nd

05.02.2021

Project Award! 🏆

N0.29, 250mm, 10m length precast piles, at 46 Barton Road, Market Bosworth for Emmerson Construction Services.

Start 3rd May 2021

05.02.2021

Project Award! 🏆

N0.529 250mm precast piles, at East Quay. Barry Waterfront for Taylor Wimpey

Start 3rd May 2021

05.02.2021

Project Award! 🏆

32,000m of 250mm square piles 1400 x 22m long, at Tilbury Port, for KKB Group.

Start March/ April 2021

03.02.2021

Project Award! 🏆

965 No. 250mm & 261 No. 300mm diameter pre-cast piles ABP Manufacturing Plant, Newport, for Knights Brown.

Start date w/c 17th May 2021

03.02.2021

Project Award! 🏆

Drilling and Grouting work in Kilmarnock, for ISG.

Start date 15th March 2021

03.02.2021

Project Award! 🏆

255 No. 250mm diameter pre-cast piles, at Dock Edge, East Quay, Barry for Whitehead Chartered Surveyors.

Start date April 2021.

02.02.2021

Project Award! 🏆

96 No. 600mm CFA contiguous piles, at Lea Road, Matlock,  for Eurovia Contracting.

Start date tbc.

02.02.2021

Project Award! 🏆

197 No. 250mm diameter pre-cast piles, at EAST QUAY BARRY,  for Barret and David Wilson Homes South Wales.

Start date April 2021.

02.02.2021

Project Award! 🏆

26 No. 300mm diameter & 18 No. 450mm diameter CFA piles, at Shuttleworth Ward, Greetwell Rd, Lincoln, for Lindum BMS.

Start date tbc

01.02.2021

Project Award! 🏆

1585no. 250mm pre-cast pilesat Martello Lakes,  for BDW Homes.  1st phase starts 22nd Feb 2021.

01.02.2021

Project Award! 🏆

119lm KPW for <1.5m RH + 5.3m upstand + galvanised posts

at Fairway Drive, Greenford,  for Oakmont Construction. Start date March 2021

28.01.2021

Project Award! 🏆

4no. 350mm pre-cast piles at Coca Cola, Morpeth,  for Absolute Civil Engineering Ltd. Start date tbc

28.01.2021

Safety Alert

The following safety alert has been produced following a spate of chemical burns from cement grout / concrete and lime etc.

Please ensure the content of this Safety Alert – ‘101 Chemical Burns from grout, cement, concrete & lime’ is briefed to all relevant personnel and ensure we control this risk on site, factory and plant.

View here.

Sites wouldn’t run out of piles, soil nails, drill rods or diesel etc. for the rig, so there is no excuse for not having the right PPE on site and controlling this risk.

If controls are not right then STOP WORK & MAKE IT RIGHT.

A signed briefing register must be returned directly to Robert speakman ASAP.

27.01.2021

Project Award! 🏆

24no. 250mm pre-cast piles at Celsa UK, Humber Way, Avonmouth – Shear Base, for Tercon Construction Ltd. Start on-site w/c 1st of Feb.

26.01.2021

Project Award! 🏆

307no. 200mm pre-cast piles at Orb Drive, Newport, for Ashgrove Partnership. Start on-site w/c 1st of March.

25.01.2021

Project Award! 🏆

77no. 178mm pre-cast piles at R1 Sherborne STW, for Wessex Water. Start on-site end of 8th February 21

25.01.2021

Project Award! 🏆

1528no. 250mm pre-cast piles at Lincoln, Donington, Viking Link, for Siemens. Start on-site end of March/April 21

6 weeks on-site

22.01.2021

Project Award! 🏆

312no. 200mm pre-cast piles  at Rainham Steel SLK Crane, Scunthorpe, for Jem Build Ltd. Start date 15th Feb 2021

21.01.2021

Project Award! 🏆

268no. 178mm pre-cast piles  at Bluebell Wood Phase 2 Coventry, for Persimmon Homes. Start date 1st Feb 2021

19.01.2021

Project Award! 🏆

224lm of KPW for 0.5-3.0m retained height at Hythe Hospital, for Kier. Start date March 2021.

19.01.2021

Project Award! 🏆

Drilling and grouting treatment work to the suspected shaft at Saltwells Nature Reserve, Dudley, for Coal Authority. Start date tbc.

18.01.2021

Project Award! 🏆

82no. 450mm dia CFA piles at Project Apollo, Britvic, Rugby, for Morris & Spottiswood Ltd.

Split across 4 phases – phase 1 starts w/c 08/02/2021

15.01.2021

Project Award! 🏆

9no. 200mm pre-cast piles at Plant & Bean Ltd, Beck Road, Boston, for HH Adkins. Start date ASAP

14.01.2021

Project Award! 🏆

804no. 200mm pre-cast piles at Wisbech St Mary, Cambridgeshire, for Speedeck. Split into 2 visits, first on the 1st April.

13.01.2021

Project Award! 🏆

19no. 750mm diameter rotary piles for Contiguous Piled mine shaft, 28m length.

Norham Road, Tecaz House, for Sirius Group. Start date TBC. Max 2 weeks on site

13.01.2021

Project Award! 🏆

Slurry Wall, Low Permeability Cut-off Wall. Upper Garnock Flood Alleviation Scheme, for McLaughlin & Harvey Ltd.

Phase 1 Start Date 01/02/2021

Phase 1 Duration 5 weeks

Phase 2 Start date TBC

Phase 2 Duration 1 week

11.01.2021

Project Award! 🏆 🏆 

201731 / 210051 ABP Border Control Posts Hull and Immingham, for C Spencer Ltd.

Project split into two separate numbers for operational benefit:

Hull: No.70, 300mm and No.158 250mm Pre-cast piles. Starts on site 15 February 2021

Immingham: No.338, 250mm, No.56, 350mm, No.142 300mm pre-cast piles. Starts on site 8 February 2021;

11.01.2021

Project Award! 🏆

51.8lm DSS for 2.0m RH. Cronton College, Widnes, for Whitfield & Brown Developments Ltd. Work starts on 8th March 2021

11.01.2021

Project Award! 🏆

50lm KPW for 1.5m RH. Royal Park, Nuneaton, for Bellway West Midlands. Work starts on 8th February 2021.

08.01.2021

Project Award! 🏆

307no. 250mm Pre-cast piles. Severn Road, Avonmouth, for Britannia Construction. Work starts on 8th February 2021.

08.01.2021

Project Award! 🏆

26no. 250mm Pre-cast piles. Southfields 25, Bredbury, for Brigdhouse Homes. Work starts on 18th January 2021.

07.01.2021

Project Award! 🏆

203mm Pre-cast piles. Midge Hall, Bromford, Manchester, for Wiggett Construction. Work starts mid-March

23.12.2020

Project Award! 🏆

9no. 273mm dia cased auger, grout filled mini piles. Spalding WMS Woodhead Bros, for ISG. Work starts in January for 1 week.

22.12.2020

Project Award! 🏆

318no. 200m DPC &  41no. 300m CFA. Aylesbury, Sainsbury’s store, for RG Group. Work starts on 25th January 2021

22.12.2020

Project Award! 🏆

925no. 200m x 250m precast piles. The Green, Shirley, for Bellway Homes West Midlands. Work starts on 25th January 2021

21.12.2020

Project Award! 🏆🏆🏆

12,672no. precast piles. Omega Zone 8, St Helens, for Bowmer & Kirkland. Work starts April 2021 with up to 5 No Rigs for 16 weeks

21.12.2020

Project Award! 🏆

49no. 200m x 200m precast piles. Sainsbury’s Ferndown GOL, for Lynx Construction. Work starts early February

16.12.2020

Project Award! 🏆

28no. 200m x 200m precast piles. Paragon Park, Coventry for Persimmon Homes Central. Work starts on 11th January.

15.12.2020

Project Award! 🏆

22no. Sacrificial sheet piles / Movax install , Tudor Road, South Shields for Birch Tree Northern Ltd.

15.12.2020

Project Award! 🏆

691no. 250mm x 250mm pre-cast piles. Metsa Timber, Boston for H H Adkins Contractors Ltd. Works start  w/c 25 January 2021 – duration 4 weeks.

14.12.2020

Project Award! 🏆

40no. 450mm dia 11-21m SFA Piles, Fujifilm, Billingham, Middlesborough for Hightown Group. w/c 4th January for approx. 2 weeks

14.12.2020

Project Award! 🏆

13no. SFA Piles, 42no. CFA Piles, Sainsbury’s Harringay GOL for Lynx Construction. Work starts on w/c 19th January.

14.12.2020

Project Award! 🏆

30 No. 600mm Ø contig piles – central 339 CHS, for Eurovia. Work starts on w/c 18th January for 2 weeks.

14.12.2020

Project Award! 🏆

798no. 250mm x 300mm pre-cast Piles.  Yatton Ph6 for Smart Systems.  Work starts  w/c 14th December 2020

11.12.2020

Project Award! 🏆

6no. 200mm pre-cast Piles. Grimsby YMCA Substation for RG Carter.  Work starts  w/c 25th January 2021

11.12.2020

Project Award! 🏆

284no. 200mm x 250mm pre-cast Piles. Askern, Care Home, Highfield Rd.  Work starts  w/c 1st March 2021

3.12.2020

Project Award! 🏆

1450no. 250 x250mm pre-cast Piles. Aerial Park, Chesham for Parkway Construction MK Ltd . SOS w/c 22nd February

2.12.2020

Project Award! 🏆

119no. 250 x300mm pre-cast Piles. Middlesbrough College, Digital Centre for Surgo Construction. Starts 18th January 2021

1.12.2020

Project Award! 🏆

84no. 305×305 UC Piles incl testing, cropping & bespoke head plate for AGE Design,  at Teesport – Steel Export Terminal Phase 3. Starts 25th January 2021

30.11.2020

📅The Monthly Round Up for October now ready to download – check out the month in numbers and see how Aarsleff and Centrum Pile have done.

30.11.2020

Project Award! 🏆

35no. 200mm section Piling for  Gem Services, AMP Isabella, Stockport.  Start date 14th December 2020.

27.11.2020

Project Award! 🏆

Remediation by Drilling and Grouting of 1nr planned Emergency Refuge Area (ERA) and 3nr overhead gantries for the M6 Smart Motorway Upgrade for Costain / J Fallon Commercial Consultants Ltd. Night-shift using 3-rigs for 6 weeks.  Start date 25th January 2021

27.11.2020

📰Check the latest Edge Newsletter – out now 📰
27.11.2020

Project Award! 🏆

10no. 178mm square precast concrete piles at Rotherham, Doncaster Road on behalf and with the authority of The Pet Vet (UK Veterinary Services) Ltd . Work starts on 7th December.

27.11.2020

Project Award! 🏆

Compact grouting for Croudace Homes Ltd. in Tadworth.  Work starts on 7th December.

25.11.2020

Project Award! 🏆

Drilling and grouting to treat and cap single shaft for East Leeds Free School, Harehills. Work starts 14/12/2020 for 2 weeks.

23.11.2020

Project Award! 🏆

3196no. 200mm & 200mm square precast concrete piles for Persimmon Homes at Rainham, Kent. Work starts early Jan 2021.

19.11.2020

Project Award! 🏆

45no. 244mm & 178mm square precast concrete piles at Clive Street, North Shields. Work starts 18th January 2021

19.11.2020

Project Award! 🏆

25no. 250mm, 300mm & 350mm square. Trial Piling element at Ince Protos. Main works to be awarded in the new year. work starts 7th December for 2 weeks

19.11.2020

Project Award! 🏆

SRW 68no 9m GU16N – Rig Install

GEO 42no 600Ø CFA Piles SWL 1350kN

at Britvic, Rugby. Starts in January 11th, 2021, for 1 week.

19.11.2020

Project Award! 🏆

Mineshaft Treatment works for The Coal Authority, St Finnian’s Church, Fife. Starts 30th November, for 1 week.

17.11.2020

Project Award! 🏆

KPW Temporary Wall w/c 19.02.21 (2 weeks)

Contig Wall w/c 13.05.21 (9-12 weeks)

KPW Permanent Wall w/c 02.09.21 (4 weeks)

Chigwell Embankment

17.11.2020

Project Award! 🏆

210no. 250mm & 300mm square precast concrete piles at Keith, Scotland. Starts in Early December, for 2 Weeks.

17.11.2020

Project Award! 🏆

25no. 250mm & 200mm square precast concrete piles at Parrs Bridge Works, Worsley. Starts in 18th November.

13.11.2020
📰Check out the latest Staff Newsletter out now – Find out if you photo has been featured and who the next AarStar is!📰
13.11.2020

Project Award! 🏆

630no. 250mm & 300mm square precast concrete piles at Eastwood Park, Nottingham. Starts in February 2021.

11.11.2020

Project Award! 🏆

53no. 250mm square precast concrete piles at Sainsbury’s Harringay, London. Starts w/c 11 January 2021 for up to 1 week.

05.11.2020

Project Award! 🏆

576no. 250mm square precast concrete piles at Mead Fields Phase 3, Weston-Super-Mare. Start date: 23/11/20.

04.11.2020

Project Award! 🏆

40no. 250mm square precast concrete piles at Hoddesdon. Start date: 04/01/21 for 4 days.

Project Award! 🏆

229no. 200mm & 250mm square precast concrete piles, and 21no. steel tubes at Moreton-in-Marsh. Start date: 07/01/21.

Project Award! 🏆

26no. 7m Sheet Piles at Saffron Walden. Start date: 04/01/21.

03.11.2020

Project Award! 🏆

260No. 200mm & 250mm square precast concrete piles at Bath Road, Keynsham. Start date: 14/12/20 for 9 days.

Project Award! 🏆

Drilling & grouting at Owlpen, School Lane, Medmenham. Start date: 16/11/20 for 5 days.

02.11.2020

Good afternoon all,

I hope you are all well and enjoying your weekend.

As you are all aware the government announced tighter restrictions in the UK yesterday which will affect us all in the short term. We will be analysing the announcement when more information is understood with a view to giving all employees an updated communication by close of business Thursday at the latest. By this time we will have assessed how this will impact us and address any changes we need to make to operate both safely and comply with the guidance. Until this time, we all must continue to work in a safe and calm way, following the current existing guidance and our own Covid risk assessments in Aarsleff offices, in Centrum and our sites.

The announcement was clear that construction and manufacturing is to remain open, also the housing market appears to be remaining open also, which will support our operations both in Aarsleff and Centrum.

We all handled the March lockdown proactively and professionally and we will do it again in November, however this time we are both better equipped and set up to respond swiftly.

The SLT are responding to this announcement immediately and will place your safety and wellbeing first while balancing the operational demand we currently face in the winter months from our clients.

Kind Regards, Kevin Hague

30/10/2020

Project Award! 🏆

35No 200mm square precast concrete piles at AMP Eastbourne. Start date: 16/11/20 for 3 days.

Project Award! 🏆

635No 200mm & 250mm square precast concrete piles at Sheerness, Gas Road. Start date: 30/11/20.

Project Award! 🏆

12No. 200mm Square precast concrete piles at Co-Op Witham, St Huges. Start date: Late November.

23/10/2020

Project Award! 🏆

1,429No 250mm square precast concrete piles at Aerial Park, Chesham. Start date: March 2021.

Project Award! 🏆

311No 250mm/3000mm Square precast concrete piles, and 31no. 450mm diameter CFA piles at Segro Plot 63, Degenham. Start date: January 2021.

20/10/2020

We have received some Excellent feedback from our client regarding our driven piling at Shaw Hall Bank Road, Greenfield. Well done!

The lads were great and nothing but professional. They got through the work well and made it as painless as possible.

Dominic Osborne, Assistant Site Manager, Wiggett Construction

20/10/2020

Project Award! 🏆

32No 450mm diameter SFA piles at Littlebrook, Dartford. Start date: ASAP.

15/10/2020

Project Award! 🏆

126No 250mm square precast concrete piles at Swansea Bay Technology Centre. Start date: W/c 9th November 2020.

09/10/20

Project Award! 🏆

15No 178mm diameter driven steel tubes at Gateshead, ICHNE Plant Comp. Start date: W/c 16th October.

Project Award! 🏆

160No. 200mm square precast concrete piles at Linn Street, Crupmsall. Start date: W/c 2nd November for a week.

Project Award! 🏆

154m King Post Wall at Farnham Depot Upgrade. Start date: W/c 2nd November for 3 weeks.

Project Award! 🏆

165No. 200mm, 250mm square precast concrete piles at Ivel Road, Shefford. Start date: October 2020

Project Award! 🏆

4,254No. 250mm, 300mm square precast concrete piles at Avonmouth Plot 9. Start date: TBC

05/10/2020

COMPANY POLICIES 📖 – The company policies have been updated. Please download the booklet and familiarise yourself with them.  If you have any queries, please raise them with the STEQ department.

02/10/2020

📅The Monthly Round Up for August now ready to download – check out the month in numbers and see how Aarsleff and Centrum Pile have done.

25/09/2020

Project Award! 🏆

101m King Post Wall at Spar in Radcliffe. Project start: W/c 26th October for 2 weeks.

Project Award! 🏆

828no. 300mm, 350mm and 250mm square precast concrete piles and 92no. H-section piles at Holderness Pumping Station Phase 2. Project start: January 2021.

Project Award! 🏆

195no. 300mm square precast concrete piles at Holderness Pumping Station Phase 1. Project start: December 2020.

Project Award! 🏆

32no. 200mm square precast concrete piles at Undercliffe Avenue, Leckhampton, Cheltenham. Project start: W/c 2nd November.

23/09/2020

We have received some Excellent feedback from our client regarding our driven piling at Bridgewater, Kingsdown. Well done!

The guys who did the last visit were brilliant to work with.

Steve Beaton, Site Manager, Taylor Wimpey Bristol

23/09/2020

We have also received an Excellent rating from our client regarding our Sheet piling works at East Quay, Watchet. Well done everyone involved!

We have received some Excellent feedback from our client regarding our driven piling at Siemens Viking Link Bridge.

Your guys on site were a good representative of your company.

Michael Card, Project Manager, nmcn

21/09/2020

We have received some Excellent feedback from our client regarding our driven piling at Slaidburn, Hodder.

I just want to let you know what a great bunch of lads we had carrying out the works at Hodder, they took part in the morning briefings and kept us updated with everything going on. They were tidy in their work area and when carrying out their tasks they each knew what they were doing, credit to them.

Richard Paley, Site Manager, J N Bentley

We have also received an Excellent rating from our client regarding our driven piling works at Amazon, Gateshead.

18/09/2020

Project Award! 🏆

102 No. 200mm square precast concrete piles at Abor Forest, New Holland. Project start: w/c 28th September 2020 for 1 week.

10/09/2020

📰Check out the latest Staff Newsletter out now – Find out if you photo has been featured and who the next AarStar is!📰

09/09/2020

Project Award! 🏆

428 No. 200mm & 250mm square precast concrete piles at Multiply Manufacturing, Blackpool. Project start: w/c 26th October 2020.

Project Award! 🏆

37 No. 200mm square precast concrete piles at The Old Stables, Spaldwick. Project start: w/c 14th September 2020.

01/09/2020

Project Award! 🏆

97 Linear metres of King Post Wall at Loadman Street, Newcastle. Project start: October 2020 TBC.

Project Award! 🏆

55 No. 200mm & 250mm square precast concrete piles at Enterprise Cars, Benson Street, Leeds. Project start: w/c 12th October 2020.

28/08/2020

📅The Monthly Round Up for July now ready to download – check out the month in numbers and see how Aarsleff and Centrum Pile have done.

24/08/2020

Project Award! 🏆

898 No. 300mm diameter CFA piles at Chamberlains Barn, Leighton Buzzard. Project start: w/c 21st September 2020.

Project Award! 🏆

37 No. 200mm/250mm Square Precast Concrete Piles & 12no. Steel Tubes at Kings Quarter, Macclesfield. Project start: w/c 19th October 2020.

21/08/2020

Project Award! 🏆

6,036 No. 250mm Square Precast Concrete Piles at Dartford Crossways. Project start: October 2020.

Project Award! 🏆

97 No. 200mm/250mm Square Precast Concrete Piles at Temple Herdewyke. Project start: w/c 7th December 2020.

Project Award! 🏆

448 No. AZ19-700 Sheet Piles at Bell Farm, Bedford. Project start: October 2020 – TBC.

Project Award! 🏆

54 No. GU8N Sheet Piles at East Quay, Watchet, Somerset. Project start: w/c 14th September 2020.

Project Award! 🏆

81 Lin/m King Post Wall at Manchester, ICON. Project start: September 2020 – TBC.

20/08/2020

Project Award! 🏆

65no. 450mm diameter Contiguous Piled Wall at Brooklime Way, Anker Valley, Tamworth. Project start: w/c 7th September 2020.

Project Award! 🏆

300No. 200mm square precast concrete piles at Shaw Hall Bank Road, Greenfield. Project start: 21st September 2020.

14/08/2020

Project Award! 🏆

54 Lin/m tied sheet pile wall at Lostock Plant, Northwich. Project start: Tbc.

Project Award! 🏆

170.4 Lin/m sheet piling at ICON, Manchester. Project start: September 2020.

Project Award! 🏆

36 Lin/m cofferdam sheet piling at Pumping Station, Downsgate. Project start: October/November 2020.

Project Award! 🏆

116No. 450mm diameter contiguous piled wall at Cockfosters WTW, Barnet. Project start: October/November 2020.

12/08/2020

Project Award! 🏆

Drilling & Grouting works at Dodsworth Capitol Park, Barnsley. Project start: 10th October 2020.

11/08/2020

We have received some Excellent feedback from our client regarding our driven piling at Kingston Cambridge.

Fantastic team – really drove the programme and very sensible cost wise on quite a complicated ground solution

Aidan Prior, Senior Surveyor, ISG, Littlebrook

10/08/2020

Project Award! 🏆

Drilling & Grouting for Spar in Radcliffe. Project start: Early September 2020 for 2 weeks.

05/08/2020

Project Award! 🏆

14No. sheet piles at Oswestry WTW. Project start: 6th August 2020.

Project Award! 🏆

22 Lin/m King Post Wall at Dodleston, Cheshire. Project start: 22nd August 2020.

04/08/2020

We have received an Excellent rating for our driven piling works at Appleton Wiske. Well done everyone involved!

03/08/2020

Project Award! 🏆

898No. 200mm & 250mm Square Precast Concrete Piles at Chamberlains Barn, Leighton Buzzard. Project start: w/c 31st August 2020.

31/07/2020

📅Check out the month in numbers in the June Monthly Round Up – Download here

31/07/2020

Project Award! 🏆

Drilling and Grouting in Gildersome, Leeds. Project start: 3rd September 2020.

30/07/2020

Project Award! 🏆

191No. 400mm diameter CFA Piles at Noss Marina. Project start: W/c 24th August 2020.

Project Award! 🏆

1419No. 250mm Square Precast Concrete Piles at Westacres, Weston Super Mare. Project start: first phase w/c 21st September 2020, second phase 2021.

27/07/2020

Project Award! 🏆

Drilling & Grouting works in Moxley. Project start: w/c 17th August 2020 for 1 week.

Project Award! 🏆

608No. 200mm & 250mm Square Precast Concrete Piles at Station Road, Lower Stondon. Project start: first phase w/c 17th August 2020.

21/07/2020

Project Award! 🏆

31m Sheet Piled Wall at Corfe Castle WRC. Project start: w/c 17th August 2020 for 1 week.

Project Award! 🏆

45m Sheet Piled Wall at Wareham WRC. Project start: w/c 24th August 2020 for 2 weeks.

17/07/2020

Project Award! 🏆

36no. Steel Tubular Piles at Dooley Terminal, Felixstowe. Project start: w/c 13th August 2020 for 1.5 weeks.

15/07/2020

Project Award! 🏆

2-days mine probe drilling at Kenton Bankfoot. Project start: July 2020.

Project Award! 🏆

220no. 200mm Square Precast Concrete Piles at Tan-Y-Lan School, Swansea. Project start: w/c 5th October 2020 for 8 days.

10/07/2020

Project Award! 🏆

Secant Piled wall, Ground Anchors, King Post Wall and Driven Precast Concrete Piles at Hay Hall, Birmingham. Project start: September 2020.

08/07/2020

Project Award! 🏆

173no. 200mm & 250mm Precast Concrete Piles & 80no. 178Ø Steel Tubular Piles at Parsonage Way, Leigh. Project start: 20th July 2020.

Project Award! 🏆

70lm KPW with AZ sheet pile infills in Aberdeen. Project start: 31st August 2020 for 5 weeks.

Project Award! 🏆

41No. Steel Tubular Piles at Shoreham Pumping Station. Project start: Tbc.

07/07/2020

Project Award! 🏆

46No. 250mm Driven Precast Concrete Piles at St. Cuthberts Redevelopment, Cardiff. Project start: mid-late August 2020.

01/07/2020

Project Award! 🏆

24No. Sheet piles for Plot 22, Clay Cross, Chesterfield. Project Start: 13th July.

30/06/2020

📰 Check out the latest photos, Covid updates and more in Issue No. 20 Staff Newsletter July/August 2020. Download here and find out more. 📰

30/06/2020

Reporting of faults and breakdowns

For Geotechnical issues, please ring:

  • 1st Graham Parkin – 07842814417
  • 2nd Karl Martin – 07990006610

For Piling and SRW issues, please ring:

  • 1st Karl Martin – 07990006610
  • 2nd S Wilkinson – 07387092128

For Stores requests and PPE, please ring:

  • 1st Adam Whitworth – 07792988174
  • 2nd Karl Martin – 07990006610
25/06/2020

Project Award! 🏆

345No. Soil Nails, Skinnerburn Road – Quayside View. Project Start: 13th July.

23/06/2020

We have received some great feedback from our client regarding our driven piling at Kingston Cambridge.

Firstly I would like to begin by saying that we were all really pleased with how well things went on site last week. Having myself been dubious about the driven pile route, I have to say I was well impressed with the speed and ease of the installation. Please pass on our thanks to the team, and in particular to Dale and Jason your two site operatives. Be very happy to work with Aarsleff again down the line.

Steve Hartley, Ley Construction Ltd

23/06/2020

📅Check out the month in numbers in the May Monthly Round Up – Download here

23/06/2020

Project Award! 🏆

81lm sheet pile wall and 8no 12m tension bars, NTS 80 struts/wailing system, Netherlock Hydro Scheme. Project start: July 2020

22/06/2020

Project Award! 🏆

186No Driven Precast Concrete Piles at Royton, Edge Lane. Project start: 27 July for 2 weeks

12/06/2020

Project Award! 🏆

248no. 250mm square precast concrete piles at Premier Inn, Faversham. Project start: w/c 3rd August 2020.

09/06/2020

Project Award! 🏆

52no. 200mm square precast concrete piles at Siemens Viking Link bridge. Project start: w/c 17th August 2020 for 1 week.

08/06/2020

Project Award! 🏆

281no. 200mm & 250mm square precast concrete piles at Buckton Fields, Northampton. Project start: w/c 15th June 2020.

04/06/2020

Project Award! 🏆

133no. 250mm & 300mm square precast concrete piles at Birmingham Central Mosque. Project start: w/c 22nd June 2020.

01/06/2020

📅 Check out the month April in numbers in the latest Monthly Round Up here 📅 

27/05/2020

Project Award! 🏆

178no. 250mm square precast concrete piles at Moody Lane, Grimsby. Project start: w/c 22nd June 2020 for 1.5 weeks.

27/05/2020

Project Award! 🏆

74no. 200mm square precast concrete piles at Appleton Wiske. Project start: w/c 22nd June 2020.

Project Award! 🏆

Drilling and grouting, Slurry Wall and King Post Wall at Gateway 45, Leeds. Project start: June / September 2020.

Project Award! 🏆

610no. 250mm square precast concrete piles at Whitley Road, Coventry. Project start: 6th July for 4 weeks.

26/05/2020

Project Award! 🏆

34no. 250mm square precast concrete piles at Heron Way, Culverts, Boston. Project start: Early July 2020.

22/05/2020

Project Award! 🏆

238no. 200mm and 250mm square precast concrete piles for Paragon Park, Coventry. Project Start: 1st June for 2 weeks.

21/05/2020

Project Award! 🏆

449no. 250mm, 300mm and 350mm square precast concrete piles for Benton Park School, Leeds. Project Start: 6th July 2020 for 17 days.

19/05/2020

I would like to take the opportunity to praise / thank Aarsleff for the work completed. There were a few issues on site which they overcame with no problems. Everything that was planned and had to be changed daily was met with the timescales explained. The management of the works was fantastic and we were kept up to date with all changes that were required. The operatives on site were also fantastic, they worked as expected and with no issues / complaints. nmcn have a number procedures in place that need to take place daily and the Aarsleff supervisor ensured these were completed on time. They were accommodating to the local residents when asked anything regarding their work and they also worked within the times required for the site area. I would have no issues in recommending Aarsleff for any future work for nmcn or any other contractor who is considering using Aarsleff. Great work, great job, Thanks.

Chris Gillespie, Project Manager, nmcn PLC

Project Award! 🏆

26no. 250mm square precast concrete piles at new paint shop, Cardiff. Project start: 1st June 2020 for 2 days.

14/05/2020

We have received an Excellent rating from our client regarding our Sheet Piling works at The Warwick School, Redhill. Well done everyone involved!

We have also received Excellent feedback from our client regarding our Precast Piling works at Avonmouth 5A. Well done!

Thanks also to your team. They did a good job on site and were a pleasure to work with.

Ian Heeley, Project Manager, Britannia Construction

13/05/2020

Project Award! 🏆

406no. 250mm square precast concrete piles at Slaidburn, Hodder. Project start: First visit mid-July, second visit TBC.

13/05/2020

We have received Excellent feedback from our client regarding our Piling works at Grimsby YMCA. Well done!

All went very well from our perspective. The service & lads on site were very good, plus, easy to work with coordinating your works on site to enable our next trade to start on time

Shaun Allerton, Site Manager, R G Carter

12/05/2020

Project Award! 🏆

84no. 250mm square precast concrete piles at Tilbury Local Grid Transformer. Project start: W/c 10th July.

Project Award! 🏆

1,235no. 200mm & 250mm square precast concrete piles at Radlett Phase 2. Project start: Mid-June with 3 visits.

07/05/2020

Project Award! 🏆

16no. 300mm square precast concrete piles at Ince Bio Power. Project start: 11th May 2020 for 3 days.

05/05/2020

📰 Find out what is going on around the Aarsleff Group in the latest One Company Magazine published in April

04/05/2020

Project Award! 🏆

117no. 200mm square precast concrete piles at Armhold Farm, Kingston. Project start: 15th June 2020

Project Award! 🏆

44 No. sheet piles (26.4 Lin/m) at Armhold Farm, Kingston. Project start: W/c 25th May or 1st June (TBC)

30/04/2020

📅Check out the month in numbers in the March Monthly Round Up – Download here

30/04/2020

Project Award! 🏆

2,529no. 300mm square precast concrete piles at Gateshead Amazon. Project start: Late June for approx. 6 weeks with 3 rigs.

28/04/2020

📰 Check out your photos and other news in the new edition of the Staff Newsletter 📰

27/04/2020

Project Award! 🏆

40 Lin/m King Post Wall with retained height 2.8m at Frome, Edmund Park Infrastructure. Project start: TBC for end of May 2020.

24/04/2020

We have received Excellent feedback from our client regarding our Piling works at Immingham Bulk Handling. Well done everyone involved!

It was a pleasure working with the operatives you sent. Please could you forward on my thanks to them for doing such a good job

Tony Quirke, Director, Cube3 Construction

22/04/2020

Project Award! 🏆

30no. 178mm diameter sheet tubular piles at Starbucks, Cardiff. Project start: 27th April 2020.

Project Award! 🏆

King Post Wall with sheet pile in-fill at Redditch Gateway, Amazon BHX8. Project start: 11th May 2020.

09/04/2020

We have received Excellent feedback from our client regarding our Piling works at Purfleet. Well done everyone involved!

I think you would be an asset to the Winvic supply chain and if you give other projects the service you gave us I’m sure you will continue to pick up more work…I wouldn’t hesitate to use you again and the more work you do for us the more user friendly you will get.

Richard Holmes, Project Manager, Winvic Construction Ltd

Project Award! 🏆

62 No. 200mm square precast concrete piles at Howarth Timber, New Holland, North Lincolnshire. Project start: 14th/15th April for 3 days.

08/04/2020

Project Award! 🏆

56 No. 200mm square precast concrete piles at Cathedral Road, Cardiff. Project start: W/c 20th April.

07/04/2020

Project Award! 🏆

49.2 Linear metre sheet piles at Norwich Research Park. Project start: W/c 27th April.

03/04/2020

Company Notice

Covid-19 letter from Kevin Hague – Read full letter

02/04/2020

Project Award! 🏆

407No. 250mm square precast concrete piles and 160no. 244mm diameter steel tubular piles at Paignton, Claylands Cross. Project start: W/c 8th June 2020 for 5.5 weeks.

01/04/2020

Coronavirus First Aid Advice

FAO First Aiders – Please see the below the downloads for advice in the current situation.

First Aid Treatment – CoronavirusCOVID-19 Public Info

01/04/2020

Project Award! 🏆

18No. 200mm square precast concrete piles at Fairfield Croft Plot 55 & 56, Skelton. Project start: May 2020 for 2 days.

30/03/2020

Project Award! 🏆

1340No. 250mm square precast concrete piles at Thatcham, Gables Way. Project start: May 2020 for 2.5 weeks.

26/03/2020

📅 February 2020 Monthly Round Up is now available to download – see an overview of the month in numbers 📅

24/03/2020

Company Notice

Latest update from Kevin Hague in light of the announcement last night from the Government – Read full statement here

20/03/2020

Project Award! 🏆

198No. 250mm square precast concrete piles at Avery Care Home, Wombourne. Project start: W/c 6th April 2020 for 6 days.

Project Award! 🏆

12No. 250mm square precast concrete piles at Pembroke Dock, ASDA. Project start: W/c 11th May 2020 for 3 days.

19/03/2020

📰Staff Newsletter Issue 18. is now published! Find out who the next Aarstar🌟 is and if your photo has been featured in the March/April edition! Download Here

18/03/2020

Company Notice

Message from Kevin Hague regarding latest Coronavirus Guidance and news – Read full statement here

17/03/2020

Project Award! 🏆

33.6 Lin/m King Post Wall at Broadstone Avenue, Port Glasgow. Project start: Tbc.

13/03/2020

Project Award! 🏆

93No. 200mm & 250mm square precast concrete piles at Maintenance Depot, Newburn. Project start: W/c 6th April 2020.

09/03/2020

Project Award! 🏆

455No. 250mm square precast concrete piles at Boston Beeswax, Carrington. Project start: W/c 13th April 2020 for 2.5 weeks.

Project Award! 🏆

246No. 250mm square precast concrete piles at YMCA Grimsby. Project start: W/c 20th April for 3 weeks.

Project Award! 🏆

111No. 200mm square precast concrete piles at Premier Inn, Didcot Oxford. Project start: W/c 27th April for 1 week.

Project Award! 🏆

75No. 200mm square precast concrete piles at Sandy Road, Willington. Project start: W/c 20th April.

06/03/2020

Safety Alert – 094 – Corona Virus – Prevent the Spread

Please download this safety alert and issue out within your teams on the how to prevent yourself from catching and spreading the virus.

05/03/2020

Project Award! 🏆

169No. 250mm square precast concrete piles at Plot 5a, Avonmouth. Project start: W/c 6th April for 2 weeks.

04/03/2020

Project Award! 🏆

293No. 250mm square precast concrete piles at Cranswick Foods, Hull. Project start: W/c 30th March for 12 days.

03/03/2020

Project Award! 🏆

28 Lin/m of sheet piled wall, with retained height of 3 metres, at Extra Care Village, Boughton. Project start: TBC.

Project Award! 🏆

7 Lin/m of sheet piled wall, with retained height of 4 metres, at The Warwick School, Redhill. Project start: TBC.

02/03/2020

Toolbox Talks 2020

The Method of delivering toolbox talks for 2020 as been changed; toolbox talks will be uploaded on a monthly basis. Please cross reference the schedule against the individual toolbox talks. Please continue to record and complete the briefing registers in the normal way. Download the schedule here

26/02/2020
📸

Thanks to our Geotechnical Engineer Andrew Shaw for this week’s frosty photograph, showcasing our new Casagrande drilling rig at our drilling and grouting site in Ouseburn. Check out the photo here.

25/02/2020

Project Award! 🏆

51no. 250mm precast concrete piles at Hare Hill, Littleborough. Project start: 16th March 2020 for 3 days.

Project Award! 🏆

12no. 300 diameter SFA Piles at Westbury STW. Project start: 9th March 2020.

24/02/2020

📅 January 2020 Monthly Round Up is now available to download – see an overview of the month in numbers 📅

21/02/2020

Project Award! 🏆

113No. sheet piles at new Porsche Dealership, Wimborne, Bournemouth. Expected start: 1st/2nd week of March.

19/02/2020

📰The latest edition of the Staff Newsletter is now available! – Download Here

19/02/2020

Project Award! 🏆

162lin/m of sheet piling at Fulham Riverside Stadium. Starts: w/c 2nd March.

18/02/2020

Project Award! 🏆

190m King Post Wall at Aldridge Road, Perry Barr. Project starts w/c 2nd March for 4 weeks.

Project Award! 🏆

148No precast piles and drilling/grouting at Ferrari Garage, The Boulevard, Leeds. Project starts in April (D&G:3 weeks, Precast: 6 Days)

17/02/2020

📸  Check out this weeks ‘Photo of the Week’ taken from the piling works undertaken for a warehouse in Purfleet. Thanks to Gary Mcdermott for the shot.  Check out the photo here.

10/02/2020

Project Award! 🏆

36no. 250mm precast concrete piles at Denham Water Ski Club. Project start: 2nd March 2020.

07/02/2020

Project Award! 🏆

488 No. sheet piles at Bardon Road, Coalville. Project start: Tbc.

Project Award! 🏆

151no. 399mm diameter steel tubular piles at Forterra, Desford. Project start: Tbc.

06/02/2020

Project Award! 🏆

2687No. 250mm square precast concrete piles at St Modwen Park, Burton. Project start: w/c 9th March 2020 for 4 weeks.

Project Award! 🏆

Temporary sheet piling at Wichelstowe Southern Access development. Project start: 1st May 2020.

03/02/2020

Toolbox Talks 2020

The Method of delivering toolbox talks for 2020 as been changed; toolbox talks will be uploaded on a monthly basis. Please cross reference the schedule against the individual toolbox talks. Please continue to record and complete the briefing registers in the normal way. Download the schedule here

31 / 01 / 2020

Project Award! 🏆

Drilling and Grouting & a King Post Wall at Oldham College. Project start: w/c 16th March 2020.

31 / 01 / 2020

We have received an Excellent feedback from our client regarding our CFA Piling works at Leeds University Business School. Well done!

I can only speak about the onsite experience but the operatives were great and very helpful.

Tom Wimpenny, Assistant Site Manager, BAM

30 / 01 / 2020

Project Award! 🏆

21 Lin/m of King Post Wall at Winchester College. Project start: w/c 9th March 2020.

29 / 01 / 2020

Project Award! 🏆

127no. 300mm square precast concrete piles & 51no. 273mm diameter steel tubular piles for Roundwell Park, Maidstone. Project start: w/c 10th February 2020 for 2 weeks.

28 / 01 / 2020

No Smoking Policy

It is the policy of Aarsleff Ground Engineering Ltd that all our workplaces are smoke free, and all employees have a right to work in a smoke free environment. Smoking (including vaping [e-cigarettes]) is prohibited in all enclosed and substantially enclosed premises in the workplace. This includes Company vehicles. This policy applies to all employees, consultants, contractors, customers and visitors.

THE LAW

Smoking in work vehicles was made illegal under the Health Act in 2006 which banned smoking in all vehicles used primarily for business purposes by more than one person.

Smoking is a personal habit that many of us have, however smoking in a vehicle presents many dangers, potential damages and cleanliness issues. Please ensure you are following the above. Stickers will be provided for you to place in your company vehicle (if not already displayed).

28 / 01 / 2020

Project Award! 🏆

68no. sheet piles at Seymour Link Road, Chesterfield. Project start: w/c 10th February 2020 for 6 weeks.

CALL FOR YOUR PHOTOS

📸 Don’t forget to send in your photos of the amazing work you’ve been doing and they could be featured on as ‘Photo of the Week’ on our social media, along with our project case studies and our website!
Send them in to HarrisonMarshall-Lack@aarsleff.co.ukor WhatsApp them to 07990006536. 📸

23 / 01 / 2020

Project Award! 🏆

51m sheet piled retaining wall at Prologis Hemel Hempstead. Project start: w/c 10th February 2020 for 1 week.

Project Award! 🏆

157no. temporary and permanent sheet piles at Nether Lock, Newark. Project start: Tbc.

21 / 01 / 2020

📅 December Monthly Round Up has been published – Check out the month in numbers!

20 / 01 / 2020

Project Award! 🏆

60no. 250mm square precast concrete piles for Boston College. Project start: w/c 17th / 24th February 2020 for 3 days.

17 / 01 / 2020

AarCommunications – Recent investments in our fleet

As we prepare for an advanced workload, we will soon take delivery of a brand new Junttan PMx22 rig (specified and tailor made for our UK markets), and a PM20 from Group.

As a business, we are always looking at how we can renew and update our plant and have a good track record for trialling different machines, for successfully reducing the overall age of our fleet and for making the most of inter-company transfers.

The investment of two new piling rigs will provide much-needed capacity to accommodate increasing orders, increasing the No of piling rigs in our fleet to 14.

17 / 01 / 2020

Project Award! 🏆

86no. 250mm square precast concrete piles for YMCA, Romford. Project start: 17th February 2020.

17 / 01 / 2020

AarCommunications – Coal Authority

Dear all,

We have just been audited by the Coal Authority for access onto the term tender for emergency call out stabilisation and specialist stabilisation works. We passed the audit with 84%, the highest score ever awarded to a contractors.

This sets a new benchmark for us all. The next stage is full award to the government procurement team, then we become a key supply chain contractor to the Coal Authority.

Our geotechnical project manager Jack Doran adds: “The high score awarded today in the Coal Authority audit reflects well on the hard work and standards that everyone in Aarsleff has been setting. If we are awarded with a contract on the framework it opens up the door to some of the most exciting projects in the geotechnical industry. ”

Kind regards,
Kevin Hague

17 / 01 / 2020

We have received an Excellent feedback from our client regarding our Drilling & Grouting works at Harper Green School, Farnworth. Well done everyone involved!

I would like to take time to thank all your lads who have worked with me Over the last two weeks, they have been very professional in their work Got on with the job and left the site clean and tidy, the school have also Mentioned that they were no bother, I would have no problem in using Aarsleff in the future.

Tony Forgione, Modulek

15/ 01 / 2020

Project Award! 🏆

43no. 250mm square precast concrete piles for Clive Lane, Cardiff. Project start: tbc.

14 / 01 / 2020

We have received an Excellent rating from our client regarding our Sheet piling work at A52 Wyvern, Bentley Motors Crewe and Gordons School Woking. Well done everyone involved!

We also received an Excellent rating from our client regarding our H-Section piling work at Teesport Phase 2. Well done!

13 / 01 / 2020
📅 Please click the linkto download the Aarsleff Group’s first Ground Engineering-specific staff newsletter. We hope you enjoy reading it!
13 / 01 / 2020

Safety Bulletin – Please download the following Safety Alert!

088 – Use of Mobile Phones. Any employee found to be using their mobile phone inappropriately may be subject to disciplinary proceedings in accordance with company policy.

Please refresh and read this safety bulletin. 

Download Safety Bulletin

10 / 01 / 2020

Project Award! 🏆

78no. 250mm square precast concrete piles at Fossdyke Paddock, Saxilby. Project start: W/c 2nd March 2020.

Project Award! 🏆

39no. 250mm square precast concrete piles at Sturminster Newton. Project start: W/c 3rd February 2020.

09 / 01 / 2020

Project Award! 🏆

406no. 350mm diameter CFA piles at Leighton Buzzard. Project start: W/c 13th January 2020.

Project Award! 🏆

254no. 300mm & 350mm square precast concrete piles at Shurgard, Barking. Project start: W/c 24th February 2020.

08 / 01 / 2020

Project Award! 🏆

2,461no. 250mm & 300mm square precast concrete piles at London Medway Commercial Park, Kingsnorth. Project start: Last week of Feb 2020 for 5 weeks.

07 / 01 / 2020

📅 November Monthly Round Up has been published – Check out the month in numbers

07/ 01 / 2020

Toolbox Talks 2020

The Method of delivering toolbox talks for 2020 as been changed; toolbox talks will be uploaded on a monthly basis. Please cross reference the schedule against the individual toolbox talks. Please continue to record and complete the briefing registers in the normal way. Download the schedule here

07 / 01 / 2020

Project Award! 🏆

Drilling and grouting works in Leadgate, Durham. Project start: late February 2020.

20/12/2019

Return to Work Briefing – should be delivered to all relevant persons all Aarsleff sites before starting any work on the 6th January 2020. Download Briefing

If you have any queries regarding this, please speak to your supervisors or a member of the STEQ team.

We wish you all a safe and restful Christmas and New Year. 🎄

19/12/2019

Project Award! 🏆

210no. 200/250/300mm square precast concrete piles at Avonmouth Fire Station. Project start: W/c 2nd March 2020 over two visits.

Project Award! 🏆

78no. 250mm square precast concrete piles at Oxford Street, Mountain Ash. Project start: W/c 13th January 2020.

Project Award! 🏆

70no. 200mm square precast concrete piles at Arco Extension, Hull. Project start: W/c 20th January 2020.

18/12/2019

Project Award! 🏆

92 Lin/m sheet piled wall with retained heights of 3.2m at Desford Brickworks Redevelopment. Project start: W/c 6th January 2020.

16/12/2019

Project Award! 🏆

122No. 750mm Ø bored piles with King Posts at Rainham Steel. Project start: W/c 27th January 2020.

Project Award! 🏆

106no. 300mm & 350mm square precast concrete piles at Hampton by Hilton, Norwich. Project start: W/c 9th March 2020 for 9 days.

13/12/2019

Project Award! 🏆

Probe drilling of 42no. holes at M6 Junction 21A-26. Project start: W/c 13th January 2020.

11/12/2019

We have received an Excellent rating from our clients regarding our driven precast piling work at Martello Lakes, Matford Green Exeter and Bristol Waste Avonmouth. Well done everyone involved!

09/12/2019

Project Award! 🏆

154no. 200mm square precast concrete piles at Swineshead Road, Boston. Project start: W/c 20th January 2020 for 4 days.

05/12/2019

Project Award! 🏆

Drilling & Grouting and 155No. 300mm/450mm diameter CFA piles Durham. Project start: D&G to start end of December, Piling to start mid January 2020.

03/12/2019

📅 October Monthly Round Up has been published – check out the month in numbers.

29/ 11 / 2019

Project Award! 🏆

50 No. steel sheet piles with pre-auger at Castle Quay 2, Banbury. Project start: w/c 13th January 2020.

27/ 11 / 2019

Project Award! 🏆

25 Lin/m King Post Wall with 3m retained height at Aldridge road, Perry Bar, Birmingham. Project start: w/c 2nd December 2019.

26/ 11 / 2019

Project Award! 🏆

4no. SFA piles & ground investigation at Bakkavor Desserts, Newark. Project start: December 2019.

18 / 11 / 2019

Policies Update and Refresh

Please see below the list of policies updated – please can you refresh and familiarise yourselves with them and make sure you are following them in your day to day activities. Thank you.

15 / 11 / 2019

Project Award! 🏆

52no. 250mm square precast concrete piles at Cannock STW. Project start: December 2019.

Project Award! 🏆

Drilling and Grouting works at Harper Green School, Bolton. Project start: Early December 2019.

14 / 11 / 2019

Project Award! 🏆

46no. 250mm square precast concrete piles at Humber Road, Barton upon Humber. Project start: Early December 2019.

Project Award! 🏆

1834no. 250mm & 300mm square precast concrete piles and 40no. 399mm diameter steel tubes at Reeds Way Southampton. Project start: January 2020 for 4 weeks.

13 / 11 / 2019

Project Award! 🏆

214lin/m of King Post Wall at Dry Street, Basildon. Project start: January 2020.

Project Award! 🏆

169no. 200mm square precast concrete piles at Campbells Meadow, Kings Lynn. Project start: w/c 9th December for 1 week.

07 / 11 / 2019

Project Award! 🏆

68no. 300mm square precast concrete piles at Nexus Howdon Satellite Depot. Project start: w/c 25th November for 1 week.

Project Award! 🏆

121no. 250mm & 300mm square precast concrete piles at Ince Bio Power. Project start: w/c 9th December 2019 for 1.5 weeks.

Project Award! 🏆

114no. 200mm & 250mm square precast concrete piles at Bamber Bridge . Project start: w/c 9th December 2019 for 7 days.

06 / 11 / 2019

📸 Check out this week’s ‘Photo of the Week’ from Gary McDermott from Stoke where we have bee installing precast concrete piles for a new concrete tank at the water treatment facility utilising out Banut 300 Midi-rig – Check out the photo here 📸

05 / 11 / 2019

Project Award! 🏆

24no. 250mm square precast concrete piles at Tanyard Farm, Rushgreen. Project start: w/c 6th January 2020.

01 / 11 / 2019

🌟The latest edition of the Staff Newsletter is now ready to download – check out your photos from around the country, and the latest news from Aarsleff – DOWNLOAD HERE 📰🌟

28/10/2019

Project Award! 🏆

93no. 300mm diameter CFA piles at St Mary’s College, Hull. Project start: w/c 18th November 2019.

Project Award! 🏆

Mineshaft capping utilising piling and consolidation grouting for Strathmore Road, Tipton. Project start: w/c 4th November 2019.

23/10/2019

📅 Check out the month in numbers in Septembers Monthly Round up now available!

23/10/2019

Project Award! 🏆

3861no. 250mm, 300mm & 350mm square precast concrete piles at Purfleet, Sergo Logistic Park. Project start: 7th January 2020 for 7 weeks

23/10/2019

In light of the recent incident at Balfour Beatty, close to the work we do here at Aarsleff and Centrum Pile, we are holding a collection towards the family. If you wish to donate, please click the link below:

https://www.justgiving.com/crowdfunding/bbcollection?utm_term=WqamqG64b

Thank you

21/10/2019

Project Award! 🏆

116No 250mm square precast concrete piles at Humber Street, Hull. Project start: 9th December for 7 days

21/10/2019

Project Award! 🏆

9No 450mm diameter SFA piles for Croda, Hull pipe bridge. Project start: Tbc

18/10/2019

Project Award! 🏆

226no. 200mm square precast concrete piles for North Chippenham. Project start: First visit: 18th November 2019

Project Award! 🏆

25no. 600mm dia bearing piles, and 141no. 600mm dia Contiguous Piles for Leeds University Business School. Project start: W/c 25th November 2019

Project Award! 🏆

Drilling and grouting operations for Gibside SEN, Gateshead. Project start: W/c 4th November 2019

16/10/2019

Project Award! 🏆

13no. 3 strand DCP ground anchors for Arundel Flood Defence Scheme. Expected start February 2020

Project Award! 🏆

132no. 273mm diameter steel tubular piles for Plymstock school, Devon. Project start: Tbc, potentially December 2019

14/10/2019

Project Award! 🏆

162no. 250mm, 300mm & 350mm square concrete piles at MSCP Build, Blackfriargate, Hull.

153no. 250mm, 300mm & 350mm square concrete piles at Office Development, Blackfriargate, Hull.

Both projects start w/c 18th November 2019 for 4 weeks.

11/10/2019

Project Award! 🏆

329No. Steel Tube Piles, Admiral Park in Guernsey, Starts W/c 25th November 2019 for 4 Weeks

Project Award! 🏆

Sheet Piling, Gordons School, Woking, Start date is TBC

07/10/2019

📸  Check out this weeks ‘Photo of the Week’ taken from the drilling and grouting stabilisation works undertaken for a new road scheme on the A737 between Beith and Dalry in Scotland. Thanks to our Construction Manager James Batty for the shot.  Check out the photo here.

04/10/2019

We have received some Excellent feedback from our client regarding our driven precast piling works at Lynton Build, Woodbridge. Well done everyone involved!

Would just like to take this opportunity to thank you for a job well done at Woodbridge. Can you also please pass our thanks to the ops on the ground. We will be in touch for future works.

Adam Bond, Contracts Manager, Elan Civil Engineering Ltd

We have received an Excellent rating from our client regarding our driven precast piling work at Sturminster Newton STW. Well done everyone involved!

03/10/2019

📸 Don’t forget to send in photos of your work from around the country to either 07990006536 or email them to harrisonmarshall-lack@aarsleff.co.uk and they could be featured on social media, the website, project case studies and more! 📸

02/10/2019

Project Award! 🏆

329no. 250mm square precast concrete piles at Plot H, Matford Green, Exeter. Project Start: Late November 2019 for two weeks.

Project Award! 🏆

60no. 250mm square precast concrete piles at Heol Bro Wen, Caerphilly. Project Start: Mid-November 2019 for two weeks.

Project Award! 🏆

634no. 200mm square precast concrete piles at Queens Court, Beverley. Project Start: W/c 14th October 2019

Project Award! 🏆

465no. 250mm and 300mm square precast concrete piles at Nearsden. Project Start: Mid-January 2020.

Project Award! 🏆

Drilling and grouting works at Annfield Plain. Project Start: End of October.

30/09/2019

We have received some Excellent feedback from our client regarding our drilling and grouting works at Grange Lane, Whickham. Well done everyone involved!

Excellent, professional service and we would highly recommend using Aarsleff.

Terry McMenam, Director, Geol Consultants Ltd

27/09/2019

Project Award! 🏆

138no. 300mm square precast concrete piles at Newhaven Phase 2 – Screening Plant Foundations. Project Start: W/c 7th October.

Project Award! 🏆

148no. 300mm square precast concrete piles at Newhaven Phase 2 – Rail Alignments work. Project Start: W/c 14th October.

Project Award! 🏆

30no. AZ17-700 sheet piles at Crindau Pill, Newport. Project Start: W/c 7th October.

Project Award! 🏆

1,141no. 250mm & 300mm square precast concrete piles at Segro Park, Rainham. Project Start: W/c 4th November.

Project Award! 🏆

Approx. 2,500no. 300mm diameter CFA Piles at Bromford FAS, Birmingham. Project Start: November 2019 (tbc)

27/09/2019

We have received some Excellent feedback from our client regarding our driven precast piling at Bowburn, Durham. Well done everyone involved!

Outstanding site team, well organised, well managed, flexible and proactive, from manager to operators a credit to Aarsleff.

Gary Lambton, Construction Manager, ISG

26/09/2019

Project Award! 🏆

41 lin/m sheet piled retaining wall at River Doe. Project Start: ASAP

25/09/2019

We have also received some Excellent feedback from our client regarding our driven precast piling at The Sands Townhouse. Well done everyone involved!

Excellent service and professional.

Andrew Bosomworth, Director, Anwen Construction

25/09/2019

We have received an Excellent rating from our client regarding our driven precast piling at Drakelow Housing Phase 2. Well done!

24/09/2019

Project Award! 🏆

84no. 250mm square precast concrete piles at Sims site, Avonmouth. Project Start: tbc

Project Award! 🏆

19no. 600mm contiguous piled wall, and 10no. rock bolts at Gibraltar Rock, Tynemouth. Project Start: 7th October 2019.

23/09/2019

We have also received an Excellent rating from our client regarding our driven precast and CFA piling at Triton Knoll, Bicker. Well done everyone involved!

23/09/2019

We have received some Excellent feedback from our client regarding our driven precast piling works at DC4 Prologis Park, Stockley. Well done!

Very professional and efficient experience and would most definitely recommend for future works.

Luke Burton, Assistant Quantity Surveyor, Readies Construction Limited

23/09/2019

Project Award! 🏆

93no. sheet piles for a 55.8lin/m retaining wall at Mossley, Manchester. Project Start: 7th October 2019.

Project Award! 🏆

110no. 250mm & 300mm square precast concrete piles at Dunball, Bridgwater. Project Start: Tbc.

17/09/2019

Project Award! 🏆

1817no. 250mm square precast concrete piles at Weston Super Mare – Phase 2. Project Start: w/c 19th November.

16/09/2019

Project Award! 🏆

466no. 200mm and 250mm square precast concrete piles at Aldridge road, Perry Bar. Project Start: TBC – Mid-October

Project Award! 🏆

234no. 450dia and 600dia SFA piles at Project Baron, Washington. Project Start: Test piles to start 7th October. TBC for main works.

Project Award! 🏆

Initial probe drilling for coal workings at Pelton Fell, Chester Le Street. Project Start: 24th September

12/09/2019

Project Award! 🏆

96no. 200mm & 250mm square precast concrete piles at Kings School, Macclesfield. Project Start: Tbc

Project Award! 🏆

229no. 250mm square precast concrete piles at Herons Reach Island, Greenfield Oldham. Project Start: 11th November 2019 for 10 days.

Project Award! 🏆

173no. 250mm square precast concrete piles at Perseverance Mill, Westhoughton. Project Start: Tbc, expected to run for 8 days.

11/09/2019

Project Award! 🏆

107no. 250mm square precast concrete piles at Fairfield Industrial Estate, Cardiff. Project Start: W/c 1st October 2019 for 1 week.

06/09/2019

Project Award! 🏆

73no. 250mm square precast concrete piles at Royal Wootton Bassett. Project Start: Early October 2019.

05/09/2019

Project Award! 🏆

Drilling and grouting at Lyndhurst Avenue. Project Start: 13th September 2019.

Project Award! 🏆

84 Lin/m King Post Wall at Cefn Saeson School. Project Start: 7th October 2019.

Project Award! 🏆

45no. 200mm & 250mm square precast concrete piles at Blackpool Enterprise Zone. Project Start: 17th October 2019.

04/09/2019

We have received some Excellent feedback from our client regarding our driven precast piling works at Welwyn Garden City. Well done!

I would personally like the thank all three men who have worked on site for Aarsleff in Welwyn, Thomas, Mark & Pat. All three have been brilliant & worked hard on the small tight site. Every thing has been good from the paperwork at the start of the project & all the way through the duration. Their attitude towards the PPE was good as they worked through some tough conditions with the hot weather.

Andrew Pickering, Site Manager, BECT Building Contractors Ltd

03/09/2019

🌟 Check out your photos and the latest updates in the September/October Staff Newsletter 🌟

02/09/2019

We have received an Excellent rating from our client regarding our driven precast piling works at Tilbury 2. Well done to everyone involved with the project!

02/09/2019

Project Award! 🏆

93no. 200mm & 250mm square precast concrete piles at Avonmouth, Bristol. Project Start: 16th September 2019 for 7 days.

Project Award! 🏆

94no. 250mm & 300mm square precast concrete piles at Boulevard Academy, Hull. Project Start: 28th October 2019.

30/08/2019

Project Award! 🏆

Contig Wall & CFA Bearing Piles at Red Lion, Manchester. Project Start: w/c 7th October 2019.

Project Award! 🏆

155no. sheet piles at Booth Street, Stockport. Project Start: October 2019.

29/08/2019

We have received an Excellent rating from our client regards to our King Post Wall installation works at Galloway Lane, Pudsey. Well done!

27/08/2019
Aarsleff Plant Hire Guide

For those who hire plant and machinery, please download the below detailed buyers guide. The guide shows the agreed rate by supplier for our most used items highlighted green where the company is the cheapest but also giving you alternative’s if for what ever reason it is not available.

By using this guide, we hope to make greater cost savings across the business for hired plant and machinery – up to £96,000 per year!

Download the Guide

27/08/2019

We have received some Excellent feedback from our client regards to our precast piling works at Highgate School, Kings Lynn:

All members of the piling team were faultless, a very difficult little job but with the assistance and full cooperation of your staff the piles went in without a hitch.

Quinton Mitchell, Contracts Manager, E N Suiter

23/08/2019

📅 We’ve published the Monthly Round Up report for July 2019! Check it out by clicking here

23/08/2019

Project Award! 🏆

595no. 250mm square precast concrete piles at Europarc, Grimsby. Project Start: 7th October 2019 for 5 weeks.

Project Award! 🏆

71no. 250mm square precast concrete piles at Lawton Gate, Crewe. Project Start: Mid-October 2019.

16/08/2019

Project Award! 🏆

770no. 200mm & 250mm square precast concrete piles at Parr Bridge, Tyldesley. Project Start: w/c 26th August 2019 (potentially split into two visits).

Project Award! 🏆

135no. 200mm square precast concrete piles at Vicarage View, Wolverhampton. Project Start: November 2019.

Project Award! 🏆

87.6 Lin/m Sheet Piled wall at Prestwich Heathlands. Project Start: w/c. 16th September 2019.

16/08/2019

We have received an Excellent rating from our client regards to our King Post Wall installation works at Southend Airport Business Park. Well done everyone involved!

15/08/2019

We have received some Excellent feedback from our client regards to our precast piling works at Mead Fields, Weston-Super-Mare:

During the time Dale and Garry were on site they were an absolute pleasure to work with. They were accommodating, polite and genuinely represented Aarsleff to a fantastic standard. I just wanted to pass on a thanks to the whole team involved on behalf of myself and my team. I look forward to working with you all again.

Karl Green , Site Manager, Taylor Wimpey Bristol

14/08/2019

Project Award! 🏆

73no. 250mm & 300mm square precast concrete piles and 59no. 339mm diameter steel tubular piles at Ashbourne STW. Project Start: 30th September 2019 for 1 week.

12/08/2019

Project Award! 🏆

140 Lin/m sheet piled retaining wall at St Albans Retail Development. Project Start: w/c. 2nd September 2019.

Project Award! 🏆

75 Lin/m sheet piled retaining wall at Trowse Primary School, Norwich. Project Start: w/c. 16th September 2019.

12/08/2019

Safety Bulletin – Please download the following Safety Alert!

090 – Excavator Crush Fatality. A piling fatality within the industry that has led to the prosecution of two employees. This bulletin highlights the hazards of working in close proximity to plant and machinery.

A briefing register must be completed and returned as normal through reception.

Download Safety Bulletin

07/08/2019

Project Award! 🏆

351no. 250mm square precast concrete piles at Coal Orchard, Taunton. Project Start: Mid-October 2019

Project Award! 🏆

193.30 Lin/m contiguous piled wall & 74no. 600Ø CFA piles at Parliament Square, Liverpool. Project Start: 9th September 2019

02/08/2019

Project Award! 🏆

61no. 250mm precast concrete piles at Lancaster Gardens, Oldham. Project Start: 12th August 2019

01/08/2019

Project Award! 🏆

Grouting operations at Murton Developments, North Tyneside. Project Start: 19th August 2019

31/07/2019

Safety Alert – Please download the following Safety Alert!

089 – Fire damage to vehicle during fabrication works. Serious incident which occurred whilst a fitter was carrying out fabrication works and failed to realise a leak in their oxygen fuel burning equipment.

A briefing register must be completed and returned as normal through reception.

Download Safety Alert

30/07/2019

Project Award! 🏆

140 Lin/m Contiguous Piled Wall on 600Ø piles at Burnigill Bank. Project Start: August/September

29/07/2019

Project Award! 🏆

King Post Wall at Blaydon Bleach Green. Project Start: TBC

26/07/2019

📅 We’ve published the Monthly Round Up report for June 2019! Check it out by clicking here

Project Award! 🏆

Grouting at 4 Grange Lane, Whickham to commence on the 12th August 2019

25/07/2019

Project Award! 🏆

111no. 178mm diameter steel tubular piles, at Hoods Road, Barry. Project to start: 3rd September 2019 for 1.5 weeks.

Project Award! 🏆

282no. CFA piles, at Leestone Park, Leighton Buzzard. Project to start: w/c 12th August 2019 for 2.5 weeks.

24/07/2019

We have received an Excellent rating again from our client regards to our precast piling works at Ilton STW. Well Done everyone involved!

24/07/2019

We have received an Excellent rating from our client regards to our precast piling works at Tower Gardens, Skegness:

“The lads and Simon were brilliant, very professional, easy to manage – what a pleasure to work with.”

Mark Tripp, Site Manager, G F Tomlinson

24/07/2019

Project Award! 🏆

193no 200mm square precast concrete piles, at Bennell Farm, Comberton. Project to start: 9th September 2019, with second visit in 2020.

23/07/2019

We have received an Excellent rating again from our client regards to our sheet piling works at Pentre, Forge Lane:

“I would like to say we have received a first class service from your site operatives to Sam Riley including your office staff estimators”

Julian Weston, Site Manager, Weston Contractors

22/07/2019

We have received an Excellent rating again from our client regards to our sheet piling works at Rotary Way, Ripon Retail. Well Done everyone involved!

22/07/2019

We have received an Excellent rating from our client in regards to our precast piling works at Dorking, Beare Gr. The Laurels, and Recycling Centre, Cwmcarn. Well Done!

We also received Excellent feedback from our client in regards to our precast piling works at Gloucester Business Park:

“Your team from Aarsleff that completed the driven piling at Plot 2000 GBP were fantastic, we had no issues whatsoever on site, the works were compete on time to high standard with no safety issues. Please thank Sam and the installation team for their excellent work and attitude.”

Reuben Edwards, Senior Project Manager, Kier Construction

19/07/2019

Project Award! 🏆

Contiguous Piled Wall & Inclined Drains, Sunderland transport scheme, start date is tbc

18/07/2019

📸 Check out this weeks tidy photo taken from Spaldington. Thanks to our piling operative Gary McDermott for our new ‘Photo of the Week’  Check out the photo here.

Project Award! 🏆

12No. 200mm square precast concrete piles at Highgate School, Kings Lynn. Project to start: w/c  30th July 2019

15/07/2019

⚽⚽⚽ We have two season tickets available for Nottingham Forest FC for the 2019-2020 season for Aarsleff and Centrum staff and operatives to use.

These will be handed out on a first come, first served basis, with the request of a small donation (minimum £5) for our chosen charity at the time of the game.

This can be used for yourself and a family member, partner, colleague and anyone within Aarsleff and Centrum organisations.

If you are interested and would like to attend one of the games below, please speak to Harrison Marshall-Lack, Marketing Assistant, on 01636 615771, or email at HarrisonMarshall-Lack@aarsleff.co.uk.

Once we have received the two season tickets, we will hand them over to you for your game. Please ensure that you return these to the Marketing Department in good time before the next match.

See fixtures here – this will be updated frequently, so please call Harrison to confirm the game is available.

15/07/2019

Project Award! 🏆

19 Lin/m of sheet pile wall, with retained height of 4.5m, for J25 Underpass – Watling Street. Project to start: TBC

11/07/2019

Project Award! 🏆

Drilling & Grouting in Prudhoe. Project to start: mid-August 2019

Project Award! 🏆

19.8 Lin/m of sheet pile wall, with retained height of 2m, for RHIW LAS, Plas Dwr. Project to start: w/c 7th October 2019

Project Award! 🏆

28no. 200mm square precast concrete piles for Sainsbury PFS, Chelmsford. Project to start: w/c 19th August 2019

Project Award! 🏆

131no. 250mm square precast concrete piles for Hob Moor, York. Project to start: mid-end of August 2019

Project Award! 🏆

91no. 250mm square precast concrete piles & 25no. 300mm SFA piles for Lincoln Court, York. Project to start: 22nd July 2019

08/07/2019

Project Award! 🏆

135no. 200mm square precast concrete piles of lengths of up to 6m for Newark Day Centre. Project to start: w/c 5th August 2019

05/07/2019

🌟 Check out the latest updates and more in the July/August Staff Newsletter 🌟

05/07/2019

📅 We’ve published the Monthly Round Up report for May 2019! Check it out by clicking here

05/07/2019

Project Award! 🏆

321no. 300mm square precast concrete piles of lengths of up to 10m for new Wicks store on Newport Road, Cardiff. Project to start: w/c 5th August 2019

Project Award! 🏆

339 Lin/m of King Post Wall for Phase 2 Springfield Park. Project to start: 29th July 2019

04/06/2019

Project Award! 🏆

41 Lin/m of temporary King Post Wall for Former Pontypridd Magistrates Court, Wales. Project to start: 29th July 2019

Project Award! 🏆

King Post Wall and CFA Piling at Yarborough Road, Lincoln. Project to start: End of July 2019

Project Award! 🏆

112no. PU32 and AZ36 Sheet Piles for Mast Quay Phase 2, Woolwich, River Thames. Project to start: 29th July 2019

Project Award! 🏆

40no. AZ26 Sheet Piles for Upper Dean RW South. Project to start: October 2019

28/06/2019

Project Award! 🏆

330no. 250mm & 400mm precast concrete piles at Winsford Salt Mine. Project to start: 29th July 2019

Project Award! 🏆

51no. 250mm precast concrete piles for Premier Inn, Newport, Telford. Project to start: 8th July 2019

27/06/2019

Project Award! 🏆

85lin/m of King Post Wall, with max retained height of 2.0m for Southend Airport Business Park. Project to start: mid-August 2019

27/06/2019

We have received some excellent feedback from our client in regards to our precast piling works at Chobham Manor in Stratford.

“I would just like to thank the piling team as they have been fantastic, since Toby arrived on site the Piling team have been very helpful and assisted us to keep things moving and worked alongside us as a team rather than being unwilling. We recognise that this has had a few hiccups along the way with machine breakdowns, moving materials and areas not available but since Toby and Richard and Craig have been on site things have moved more smoothly.”

Matthew Aylen, Regeneration Performance Manager, Taylor Wimpey East London

25/06/2019

Project Award! 🏆

66no. 250mm precast concrete piles for Premier Inn, Welwyn Garden City. Project to start: 19th August 2019

24/06/2019

Project Award! 🏆

192no. 200mm precast concrete piles for Phase 2 at Drakelow. Project start: W.C. 22nd July 2019

24/06/2019

Safety Alert – Please download the following Safety Alert!

088 – Use of Mobile Phones whilst on site. Any employee found to be using their mobile phone inappropriately may be subject to disciplinary proceedings in accordance with company policy.

A briefing register must be completed and returned as normal through reception.

Download Safety Alert

21/06/2019

Project Award! 🏆

214no. 200mm precast concrete piles at Norfolk Street, Stoke On Trent. Project to start end of July / early August 2019.

19/06/2019

📸 Check out this weeks stunning photo taken from Clay Cross of the H-Section posts being installed for the King Post Wall earlier this month. Thanks Keir Vause for snapping this week’s ‘Photo of the Week’  Check out the photo here.

19/06/2019

Project Award! 🏆

Compaction Grouting in Albox, Farnborough. Project Start: Early-July 2019.

Project Award! 🏆

372no. Temporary Sheet Piles for a Cofferdam on the A52 Wyvern, Derby. Project Start: Mid-July 2019

Project Award! 🏆

513no. 200mm Precast Concrete Piles, in Kidderminster. Project Start: 24th June 2019 for 4 weeks.

14/06/2019

📸 Thanks to Construction Manager Jim Wilson for this week’s ‘Photo of the Week’ taken in Clay Cross where Aarsleff have finished installing a King Post Wall on a new residential development. Check out the photo here.

14/06/2019

Safety Alert – Please download the following Safety Alerts!

087 – A N Other piling rig struck a live 132Kv cable. The safety alert details the investigation findings and circumstances which led to the event. Lessons learnt included within the brief.

A briefing register must be completed and returned as normal through reception.

Download Safety Alert

13/06/2019

Project Award! 🏆

CFA Piling and King Post Wall, at Middle west Park, Kettering. Project Start: w/c 8th July 2019

Project Award! 🏆

100no. 250mm Precast Concrete Piles, at Hexham Close, Stockport. Project Start: ASAP for 7 days on site

12/06/2019

Project Award! 🏆

80no. 200mm Precast Concrete Piles, at Fliplastics, Spaldington. Project Start: Phase 1 to start 1st July 2019, with Phase 2 in December 2019.

Project Award! 🏆

58no. Mini Piles, 197no. Soil Nails and Shotcrete for Camfferman Chalets, at Route de Morel, French Alps. Project Start: TBC.

07/06/2019

Project Award! 🏆

40Lin/m of King Post Wall with retained height up to 2.5m at Keephatch Beech, North Wokingham. Project Start: w/c 1st July 2019.

Project Award! 🏆

52no Sheet Piles at The Sands Townhouses, Durham. Project Start: mid July 2019.

07/06/2019

📸 Thanks to Joe Mills for this week’s ‘Photo of the Week’ at Newark Marina where Aarsleff are installing sheet piles at Newark Marina on the river bank of the Trent. Check out the photo here.

07/06/2019

Project Award! 🏆

Grouting Operations. Weir Hotel, Bacup. Immediate start date

04/06/2019

We have also received an excellent rating from our client in regards to our Sheet Piling works on Mill Road, Rugby. Well Done!

03/06/2019

We have received an excellent from our client in regards to our Driven Precast Piling works at Springfield Nurseries. Well Done!

30/05/2019

Project Award! 🏆

63no. 250mm square precast concrete piles at Tower Gardens, Skegness. Project Starts: w/c 24th June 2019.

28/05/2019

📅 We’ve published the Monthly Round Up report for April! Check it out by clicking here

23/05/2019

Project Award! 🏆

65 Lin/m of GU8 sheet piles for Eastgate Nursery, Bury St Edmunds. Project Starts: w/c 10th June 2019.

22/05/2019

Project Award! 🏆

240no. 250mm & 300mm square precast concrete piles for Penmaen Road, industrial Units 2-5, Conwy. Project Starts: 8th July 2019 (provisional date) for 3.5 weeks.

21/05/2019

We have received some excellent feedback from our client in regards to our Sheet Piling works at Newark Water Lane:

“Aarsleff have installed sheet piled pits at multiple site on the Major Sewer Upgrade for STW in Newark, overall, the experience has been positive. From start to finish Aarsleff have been most helpful and very professional, a pleasure to work with. Look forward to working with you again soon.”

Ahmed Elayan, Site Manager, nmnc

21/05/2019

Project Award! 🏆

451no. 250mm & 300mm square precast concrete piles for Proposed AD Plant, Ellesmere Port. Project Starts: 3rd June 2019.

Project Award! 🏆

84Lin/m King Post Wall up to 4.5m retaining heights for Horsehay, Telford. Project Starts: W/C 20th May 2019.

17/05/2019

Project Award! 🏆

8No. 600mm diameter CFA Piles up to 17m depths for Bran Sands ETW. Project Starts: Mid-June.

Project Award! 🏆

6No. 250mm Precast Concrete Piles & 33No. 178mm diameter Steel Tubular Piles at Sturminster Bourton STW. Project Starts: TBC.

16/05/2019

Project Award! 🏆

343No. 200mm Precast Concrete Piles & 4No. Driven Steel Tubular Piles for Aspall Cyder, Suffolk. Project Starts: Mid-July for 2.5 weeks.

Project Award! 🏆

154No. 200mm Precast Concrete Piles & 13No. 178mm diameter Steel Tubular Piles for Plots 19-36 at Littleborough. Project Starts: 17th May.

13/05/2019

Project Award! 🏆

99No. 200mm Precast Concrete Piles, up to 6m in length on Verney Street, New Houghton. Project Starts: 27th May for 1 week.

10/05/2019

Project Award! 🏆

40 lin/m of sheet piling on Rotary Way, Ripon. Project Start: 10th June for 3-4 days.

09/05/2019

Safety Alert – Please download the following Safety Alert!

086 – 11Kv Cable strike – Installing a Setting Out Pin.  The attached highlights the need to ensure whenever we break ground we are clear that a thorough survey of underground services has been carried out and that any services are marked /identified at the surface. This should be supported by a permit to dig covering ALL areas / locations where we will be breaking ground, even setting out pins. This is potential more dangerous than striking with a rig because the person is general holding the setting out pin and is much closer to any resulting explosion.

A briefing register must be completed and returned as normal through reception.

Download Safety Alert

I have read and understood
09/05/2019

Project Award! 🏆

32no. 450mm diameter CFA Piles, up to 12m lengths. For HJ Enthoven, Derbyshire. Project Start: 27th May for 1 week.

Project Award! 🏆

2,103no. 200mm to 400mm square section precast concrete piles, from 14m to 19m lengths. For Bowburn, Durham. Project Start: 22nd July for 7 weeks.

08/05/2019

Project Award! 🏆

6No. 200mm Precast Concrete Piles, up to 7m in length, WWTW Northwich. Project Starts: 20th May.

Project Award! 🏆

143lin/m King Post Wall, Ley Pools and Leisure Centre, Oxford. Project Starts: 20th May for 1 week.

07/05/2019

‘Photo of the Week’ 📸 Thanks to Brian for sending this weeks photo of the precast piling works out at Triton Knoll Substation. View the photo here.

07/05/2019

We received an excellent rating from our client in regards to our Driven Precast Piling works at Hythe Martello Lakes Phase 6 – Well Done!

07/05/2019

Project Award! 🏆

192No. 250mm & 300mm Driven Precast Concrete Piles, Gloucester Business Park – Plot 2000. Project Starts: 24th June for 1.5 weeks

03/05/2019

We received an excellent rating from our client in regards to our Driven Precast Piling works at Burton Gateway – Well Done!

We also received some excellent feedback from our client in regards to our Driven Precast piling works at New Paint Shop, Brindley Road project:

“The team were a pleasure to work with. Very knowledgeable and their experience clearly showed through. Their attention to safety was admirable.”

Bill Middup-Jones, Site Manager, Tema Group

02/05/2019

Plant Department – Breakdown Reporting & Hydraulic Hose repairs

To capture and monitor response times and fault types for breakdowns you are required to notify the Plant department on any of the following numbers below immediately that the fault develops which results in the machine being unable to work, you are also requested to notify the relevant numbers below as soon as the machine is back up and running after the repair has been completed either by our own fitters or sub contract fitters. – Steve Wilkinson, UK Group Plant Manager.

Download full Memo with contact information of Plant fitters

02/05/2019

🌟 Who is the next AarStar? Download the May/June 2019 Staff Newsletter here to find out more!

02/05/2019

Project Award! 🏆

123No. Driven Precast Concrete Piles, Colne WwTw, Lancashire, Starts w/c 3rd June for 1 week

01/04/2019

We received some excellent feedback from our client in regards to our Driven Precast piling works at Web Ellis Park, Rugby:

“The service provided from start to finish has been EXCELLENT. Your site operatives were knowledgeable and professional and worked very ‘constructively’ with the Vidi site workers for the duration of the piling works – particularly when some concrete obstructions were found in several sections of the site!!”

Martin Birkett, Construction Director, Vidi Construction

01/04/2019

Project Award! 🏆

36no. 300mm diameter grouted mini piles at Holbeck Delivery Unit, Leeds. Project start: TBC.

Project Award! 🏆

37no. 300mm square precast concrete piles on Stewart Street, Cardiff. Project start: 20th May 2019 for 1 week.

29/04/2019

Project Award! 🏆

47no. 250mm square precast concrete piles at GLJ Recycling Plant, Cwmcarn. Project start: w/c 7th May 2019.

26/04/2019

Project Award! 🏆

24no. 300mm diameter SFA piles (10m depth) at West Orchard Shopping Centre, Coventry. Project start: 6th May 2019 for 1 week.

25/04/2019

The latest edition of the Aarsleff Group ‘One Company’ magazine is now available to read. Features include drilling 2m piles on the port of Aarhus and Clacton-on-Sea coastal stabilisation works in the UK.

Read more by clicking here

23/04/2019

We received an excellent rating from our client in regards to our King Post Wall project at Edenbridge Station Road. Well Done!

18/04/2019

Project Award! 🏆

Sheet piling works at Britvic, Rugby. Project start: Late May/early June.

Project Award! 🏆

21no. 250mm square precast piles at Spalding Wygate Park Academy. Project start: 28th May 2019

18/04/2019

We’ve published the Monthly Round Up report for March! Check it out by clicking here

17.04.2019

Project Award! 🏆

Sheet piling works at Newark Marina. Project start: W/c 20th May.

Project Award! 🏆

130no. Sheet piles on Norfolk St, Stoke on Trent. Project start: mid June/July.

Project Award! 🏆

54no. Sheet piles for Mill Road, Rugby. Project start: w/c 07th May.

17.04.2019

‘Photo of the Week’ 📸 Thanks to Parth Patel for sending this weeks photo of our new ABI TM17 rig at Chobham Manor, Stratford pre-boring pile positions ready for precast. View photo here.

17.04.2019

Safety Alert – Please download the following Safety Alerts!

085 – Issued following changes to the HSE Enforcement Expectations in relation to new evidence which shows that exposure to ALL welding fume including mild steel, can cause cancer. It is estimated that there are 150 deaths from work related cancer caused by welding every year.

  • It is estimated that there are 150 deaths from work related cancer caused by welding every year.
  • The Alert summarises the key points of assessing risks in relation to welding fume
  • Applies equally when working OUTSIDE

The links below provide further reading and information on welding fume and ‘What good control looks like’

  • Links directly to the HSE website ‘Welding Health & Safety’ http://www.hse.gov.uk/welding/index.htm
  • Links to the Breathe Freely website. http://www.breathefreely.org.uk/index.html
  • Breathe Freely is a BOHS (British Occupational Hygiene Society) initiative, aimed at reducing occupational lung disease in the UK, which causes significant debilitating ill-health and an estimated 13,000 deaths per year

Delivery of these communications should be tailored to your specific site requirements but the recommendations within must be adopted into working practice.

A briefing register must be completed and returned as normal through reception.

Download Safety Alert

I have read and understood
12.04.2019

Project Award! 🏆

488no. 200mm & 250mm square precast concrete piles on Meton Road, Woodbridge. Project start: 10th June for 4.5 weeks.

09.04.2019

Project Award! 🏆

143no. 200mm square precast concrete piles, and 561m of precast ground beams at Askern site. Project start: w.c 27th May 2019.

08.04.2019

Project Award! 🏆

Installing sheet piles at JLR, Brighton. Project start: w.c 15th April.

Project Award! 🏆

Installing SFA piles at Sutton Courtenay Church. Project start: 13th May.

Project Award! 🏆

Installing a King Post Wall at Kentmere. Project to start early/mid May.

05.04.2019

‘Photo of the Week’ 📸 Thanks to Joe Mills for this week’s photo from Water Lane, Newark, extracting 254No. sheet piles, 10m in length. View photo here.

05.04.2019

Project Award! 🏆

172No. 200mm precast concrete piles for Miners Welfare, Ainsworth Drive Nottingham. Start date: 22nd April for 1 week.

Project Award! 🏆

34No. 450mm diameter piles to create a contiguous piled wall for Gibraltar Rock project. Start date: 6th May for 4 weeks.

Project Award! 🏆

Installation of a contiguous piled wall and Cofferdam on A465. Project to start in April.

04.04.2019

Project Award! 🏆

549No. 250mm, 300mm & 350mm square precast concrete piles at Chatham Waters, Gillingham. Project start: 10th June for 4 weeks.

Project Award! 🏆

147No. 250mm square precast concrete piles for Webb Ellis Park, Rugby. Project start: 15th April for 1 week.

Project Award! 🏆

25No. 200mm square precast concrete piles at Ilton STW Somerset. Project start: July 2019.

02.04.2019

Project Award! 🏆

31 Lin/m of GU13N sheet piles for Westbury WRC. Project start: Mid-May for two weeks.

Project Award! 🏆

Drilling & Grouting works for A737, The Den. Project start: 22nd April 2019.

Project Award! 🏆

1202No. 250mm & 300mm square precast concrete piles for DC4 Prologis Park, West London. Project start: 8th May for 5 weeks with two rigs.

01.04.2019

We received some excellent feedback from our client in regards to our Driven Precast piling works at Nottingham Science Park:

“May I take this opportunity to express that myself and Ashley have enjoyed working with Aarsleff, your quick mobilisation was helpful, the operatives on site were great and commercially you have been very user friendly – we look forward to working with you again on future projects.”

Katie Butler, Project Surveyor, Willmott Dixon
Ashley Bird, Building Manager, Willmott Dixon

28.03.2019

Project Award! 🏆

173No. 250mm square precast concrete piles for Roundwell Park Maidstone. Project start: TBC for two weeks.

26.03.2019

Reminder – This Friday (29th March) is the Quarterly Site Operatives meeting at 1pm. If you are unsure on which meeting location you need to attend, please speak with your head of department / manager.

IMPORTANT: When you have read and understood the above message, please click the button below, fill out your full name, and click send. Thank you.

I have read and understood
26.03.2019

We’ve published the Monthly Round Up report for February! Check it out by clicking here

25.03.2019

Aarsleff Awarded RoSPA Gold second year running

Aarsleff Ground Engineering are extremely pleased to have maintained our Gold standard quality for the second-year running in the internationally-renowned RoSPA Health and Safety Awards, the longest-running industry awards scheme in the UK.

The Gold Award recognises Aarsleff’s high level of performance, well-developed occupational health and safety management systems and culture, outstanding control of risk and very low levels of error, harm and loss.

Congratulations all!

25.03.2019

Project Award! 🏆

189No. 250mm square precast concrete piles in Peterborough. Project to commence 13th May for two weeks.

22.03.2019

Project Award! 🏆

Driven King Post Wall at Stoke, Hanley, Lichfield Street. Project Start: w.c. 1st April.

19.03.2019

Download and read the latest Worksafe Committee Minutes here.

Please ensure you look through these as there are actions for some who may not have been in attendance, if you have actions with a deadline please email your findings to ZoeBotterill@aarsleff.co.uk

18.03.2019

Project Award! 🏆

2013No. 250mm driven precast piles & 162No. 178mm diameter steel tubular piles at Mead Fields, Starts May 2019 with works completed over 4 visits.

14.03.2019

Project Award! 🏆

525No. driven precast piles at Tilbury, Starts 15th April for 3-4 weeks using two rigs

14.03.2019

We received some excellent feedback from our client in regards to our Driven Steel Tube piling works at Minworth STW from Ian Mawdsley, site manager at Stantec:

“Excellent service and execution of the contract”

We have also received some excellent feedback from our client for the Driven Precast Piling works at WestOne Phase 2 from John Crowhurst, site manager at Devon Construction:

“Your guys were great to work with. Always very helpful, never had to pull them up on health & safety matters and they tidied up before they left at the end of the week. Would be glad to work with them again.”

14.03.2019

‘Photo of the Week’ 📸 Thanks to Sam Riley for sending this weeks photo from Nottingham Science Park with our Junttan PM20 driving 201No. 250mm precast piles. View photo here.

13.02.2019

Project Award! 🏆 

38Lin/m of GU13N Sheet Piles at Burlington Hotel Extension, Sheringham, Starts in 2/3 weeks time.

Project Award! 🏆 

55 No Piles at Pentre, Forge Lane, Starts w/c 22nd April for 1 week

13.03.2019

We received some excellent feedback from our client in regards to our Driven Precast Concrete piling work at Worsley – RHS Garden Bridgewater:

“Your guys did a great job with their works and completed early. We were very impressed and both myself and Gareth Davies will feed this back to our people and hopefully more will come from BAM for yourselves”

Peter Shields, Senior Quantity Surveyor, BAM Construction Ltd

12.03.2019

Special mention to Phil Hewkin and Carl Fleming for the driven precast concrete piling work at HMS Cumbria. We received some excellent feedback:

“Just a quick email to state our satisfaction with the works carried out last week and the manner in which the project was managed both on and off site. There were a few challenges along the way with the rig loading and dates fluctuating from our side but the professionalism shown from yourselves before and during the works is much appreciated. A special mention must go to Phil and Carl your team on site who simply got on with it in a very safe collaborative manner working closely with our groundworks contractor. We would appreciate if you would pass this message on to the lads.  Thanks again and we look forward to working with you in the future.”

Mark Stephens, Senior Project Manager, Morgan Sindall

12.03.2019

Project Award! 🏆 

556No. DPC at Coventry Whitley South, Starts mid/late April for 4 weeks.

11.03.2019

Project Award! 🏆 

Drilling & Grouting works at Dudley Community Centre. Expected to start 25th March for 1 week.

Project Award! 🏆 

Driven Precast Concrete piling works at Waterside, Northampton. Starts 8th April for 1 week.

11.03.2019

Aarsleff Ground Engineering were rated EXCELLENT by Taylor Wimpey North East regarding our Drilling & Grouting works at Kenton Bankfoot. Well Done!

“All very positive and keen to work with you again”

– David Abercrombie, Technical Director

08.03.2019

Project Award! 🏆 

Drilling and Grouting at Lanchester Wines, 12 week project Starts April.

Project Award! 🏆 

50lin m of King post wall at Leeds Pudsey, Starts 6th May.

08.03.2019

Policy Update – The Occupational Health & Safety policy for Aarsleff Ground Engineering has been updated. Please make sure you have read over these for your knowledge. Read the full policy here.

07.03.2019

🌟 Who is the next AarStar? Download the March/April 2019 Staff Newsletter here! 

06.03.2019

‘Photo of the Week’ 📸 Thanks to Joseph Mills for sending over this weeks photos from Dartford, installing 218No. GU8 sheet piles, of up to 6m in length. View photo here.

04.03.2019

Aarsleff Ground Engineering were also rated EXCELLENT by our client Bellway Homes (West Midlands) regarding our Driven Precast Piling works at Branston Leas. Well Done!

04.03.2019

Aarsleff Ground Engineering were rated EXCELLENT by Graham Construction regarding our SFA Piling works at Train Care Facility Scarborough. Well Done!

“Site team were generally helpful. Work was completed safely, to a very good standard and within programme.”

– Daniel Kelm, Site Agent/Project Manager

01.03.2019

Aarsleff Ground Engineering were rated EXCELLENT by our client Buckingham Group regarding our Restricted Access SFA Piling works at York Community Stadium. Well Done!

Aarsleff Ground Engineering were also rated EXCELLENT by our client Wessex Water regarding our Restricted Access Bottom Driven Piling works at East Knoyle STW. Well Done!

28.02.2019

Project Award! 🏆 

Grouting works & 332No. 200-300mm square precast piles & steel tubular piles for Strathmore Road, Tipton.

28.02.2019

Aarsleff Ground Engineering were rated EXCELLENT by our client Monostore regarding our Driven Precast Concrete Piling works at Eye Airfield Crown Chicken. Well Done!

Head of UK, Nick Stringer said:

Aarsleff performed to the highest standards for safety and quality. I will be using Aarsleff again in the future.

28.02.2019

🌻 Spring time driving

With winter fading into the background and better weather all around you’d think the roads would finally be safe again. This isn’t always the case… spring showers bring May flowers and the after effects of winter weather – potholes and uneven pavement. Here are some handy things to remember and keep you safe whilst enjoying the Spring.

  • If you’re using winter tyres, ensure the average temperature stays above 7° C before removing them.
  • The wide fluctuations in temperatures and freeze-thaw cycles that occur at this time of year cause potholes to form.
  • Pollen and the ensuing hay fever can be overwhelming and frustrating for some people. Take care to keep up to date with your local pollen counts and medicate accordingly. Be aware, a lot of over the counter allergy medication can affect your driving and concentration. Remember if you sneeze at 70mph you loose vision for as much as 100 meters.
  • Driver distraction is a leading cause of traffic crashes. Remember to stay focused on the task of driving and let your passengers enjoy the sights, sounds and smells of spring in safety.

To find out more download the leaflet

28.02.2019

Project Award! 🏆 

320No. 250mm square precast piles, New Paint Shop, Brindley Road, Cardiff, Starts: 11th March for 4 weeks.

27.02.2019

Project Award! 🏆 

86No. 250/300/350 square precast piles, John Lennon Airport, Liverpool, Starts w/c 29th April for 4 days.

26.02.2019

Project Award! 🏆 

20No 600dia bores and King posts for RAC Epsom, Starts w/c 4th March for 2 weeks.

22.02.2019

‘Photo of the Week’ 📸 Thanks to Vasil Dilov for sending over this fantastic panoramic showing 150 lin m of King Post Wall Mansfield. View photo here.

22.02.2019

Project Award! 🏆 

440Lin/m2 GU13 & GU16 sheet piles, Starts: 11th March for 4 days, Cockermouth Retirement Flats.

Project Award! 🏆 

12No. 200mm square precast concrete piles, Starts: 4th March for two days, Newark Lorry Park Extension.

21.02.2019

Special mention to Dale Noon, Phil Hewkin and Carl Fleming for the driven precast concrete piling work completed at the Irish World Heritage Centre. We received some excellent feedback:

“Many thanks for the recent work carried out at the Irish World Heritage Centre. It was largely trouble free and your lads were both professional and helpful”

– Chris Meads, Project Manager, Truman Design & Build

20.02.2019

Memo – HIGH IMPORTANCE

The Company has received a Notice of Contravention from the HSE in respect of our operations on a recent project.  Please read this carefully if you do not understand the content please ask for clarification.Please find below details from Operations Director Jody Parkin, which outlines your responsibility regarding health and safety across the whole of our Company.  It demonstrates the Company commitment to improved actions by us all when carrying out our roles and responsibilities.

Download here

18.02.2019

Project Award! 🏆 

70No. 200mm & 250mm square precast concrete piles, Starts early April for three days, Dorking, Beare Green.

18.02.2019

We’ve published the Monthly Round Up report for January 2019! Check it out by clicking here

18.02.2019

🔉 Announcement – Diesel Exhaust Emissions!

This February, Aarsleff Ground Engineering & Centrum Pile are supporting IOSH’s ‘No Time to Lose’ campaign. Diesel exhaust fumes were classified as “probable carcinogens” back in 1988, but the International Agency for Research on Cancer, part of the World Health Organization, has recently upgraded them to a Group 1 carcinogen, so these emissions are now treated as a definite cause of cancer in humans. It’s estimated that in Britain, more than 650 people a year die of lung or bladder cancer as a result of being exposed to diesel exhaust fumes at work. Around 800 new cases of cancer linked to diesel exhaust fume exposure are registered each year.

What you should do

  • Speak to our STEQ team if you want more information
  • Do what you’re asked to protect yourself and always do your job in the way you’ve been directed
  • If you’ve been asked to wear protective kit, make sure it fits properly, you know how to use it, and that you wear it every time you need to
  • Remember that this can help look after your health. Make sure your work-mates do the same. Remember they may be risking your health, not just their own
  • Report any problems to your employer – e.g. faulty or missing equipment
  • Watch out for signs that diesel fumes are causing a problem: walls or surfaces are covered in soot, there is a smoky-looking haze when diesel engines are used, there is blue or black smoke coming from diesel exhaust fumes
  • Download our Fact Sheet on Diesel Exhaust Emissions

To find out more download the Fact Sheet

15.02.2019

‘Photo of the Week’ 📸

Thanks to our welder Keir Vause for sending in this week’s photo from the sheet piling works at Water Lane in Newark. View the photo here

14.02.2019

Project Award! 🏆 

89No. holes, 509t of grout, Starts late February for two week, Snowhill Services, Wakefield.

Project Award! 🏆 

1020m2 of 17m AZ20-700 sheets piles, Start date: 25th March for one week, Mickram, Kings Lynn.

12.02.2019

Safety Alert – Please download the following Safety Alerts!

080 – Near miss incident with mini piling rig boring 600mm piles for king post wall.

  • Legislation places a ‘practicable duty’ to prevent access to dangerous rotating parts.
  • It is also a legal duty to provide suitable and sufficient risk assessments/ site paperwork and ‘not to interfere with or misuse anything that’s been provided for your health, safety or welfare’.
  • Safety gates with interlocks must be fitted to all mini-rigs along with a slow rotation / inching mode. These systems must be in place at all times and maintained in effective working order.
  • Site paperwork must be thoroughly prepared, checked, briefed and understood by everyone involved with the process.

Download Safety Alert

11.02.2019

🔉 Announcement – Silica Dust!

This February, Aarsleff Ground Engineering & Centrum Pile are supporting IOSH’s ‘No Time to Lose’ campaign. Silica dust is one of the oldest workplace hazards, being one of the most significant causes of work-related disease around the world. 15 people a week die from silica dust exposure at work in Britain.

How can we control the amount of silica dust?

  • Wear the right gear for the job – make sure to wear the right respiratory gear suited for the task you are doing
  • Try assessing if you could use a different material, or change working practices to produce less dust
  • Try working in well ventilated spaces and outdoors when you can
  • Use water suppression whilst cutting

Download your Silica Dust fact Sheet!

08.02.2019

Project Award! 🏆 

219No. GU8N sheets piles with retained heights of 1.61m, Starts 25th February, Dartford, Kent.

07.02.2019

Project Award! 🏆 

18No. Bored piles 150mm diameter, Starts 11th February for one week, East Knoyle STW.

Project Award! 🏆 

71No. Bored piles 450mm diameter & 4No. passive ties, Starts mid-February for three weeks, Haddricks Mills Phase 3.

06.02.2019

📸 ”Photo of the Week’

Congratulations to Sam Riley for this week’s photo, showing our Junttan PM20L piling against a backdrop of sunny skies, installing 175 No. piles at Boston college for their new Engineering, Manufacturing and Technology Centre. View the photo here.

05.02.2019

Project Award! 🏆 

50-66 No. GE piles 100mm diameter – 4m length, Start date 18th February, Salisbury Road, Long Eaton.

Project Award! 🏆 

Grouting works: 5200m2 area with approx 2189t of grout, Start date TBC, Gildersome, Leeds.

04.02.2019

🔉 Announcement – Asbestos!

This February, Aarsleff Ground Engineering & Centrum Pile are supporting IOSH’s ‘No Time to Lose’ campaign. Asbestos didn’t disappear when its use was banned: it can still be found throughout domestic and commercial properties. In Britain alone, around 5,000 people a year die from an asbestos-related cancer.

What do I do if I accidentally damage ‘Asbestos–containing’ material and it releases dust?

  1. Stop Work Immediately
  2. Move everyone away and ensure nobody enters the area
  3. Do not remove Equipment or Materials
  4. Close, Seal or Lock off the area
  5. Put up Warning Signs
  6. Report it to your Employer

Download your Asbestos fact sheet today!

Safety Alert – Please download the following Safety Alerts!

077 – Relates to a damage incident which occurred during de-rigging of a Junttan piling rig.

  • • The leader Lift Device must always be lowered immediately following rigging up.
    • Always follow the manufacturer’s instructions – report any defects / problems.

Download Safety Alert

074 – 410v Live electric cable strike

  • Always ensure permits are in place, supported by relevant drawings and that all services are marked clearly at ground level.
  • Delivery of these communications should be tailored to your specific site requirements but the recommendations within must be adopted into working practice.
  • A briefing register must be completed and returned as normal through reception.

Download Safety Alert

29.01.2019

Project Award! 🏆 

9No. 450/508 6m long bored piles to take H-Sections, Starts 11th Feb for 1 week onsite, The majestic in Leeds

Project Award! 🏆 

30No. 178mm Steel Tube Piles, 9 metre length,  Starts 4th March for 2 days, Minworth

25.01.2019

Project Award! 🏆 

108 No. 250mm & 300mm square Precast Concrete Piles, Start date: 25th February for 5 days, HMS Cambria.

Project Award! 🏆 

1355 No. 250mm & 350mm square Precast Concrete Piles, Start date: 3rd March for two of the phases and last one in November 2019, Chobham Manor Phase 3D.

25.01.2019

📸 ”Photo of the Week’

Congratulations Richard Judd for sending in this week’s ‘Photo of the Week’ where we were called upon to install 120No. driven precast concrete piles, 9m in length and 300mm square, for a community centre extension. Interestingly, Aarsleff Ground Engineering also piled the Mosque’s original foundations back in 1998! View the photo here.

24.01.2019

Project Award! 🏆 

1783No. Driven Precast Concrete Piles, including testing, setting out, non-working foreman, welfare and fencing

Start date: 18th March for 10 weeks, Triton Knoll, Bicker, Boston.

23.01.2019

Memo 

HIGH IMPORTANCE –EFFECTIVE DATE 23rd JANUARY 2019

We have now changed our supplier of all our Gas Oil needs and now work solely with Watson Fuels. You will continue to place your orders as you do now via Reception.

You will need to ensure the below information is available as reception will need this to place a successful order:

Delivery Address, QTY, Number of Tanks to fill, Delivery/Special Instructions & Opening times

Orders placed before 1pm will be made within 48Hours, the more notice you can give the better.

Download MEMO here

– Zoe Botterill, Office Manager

18.01.2019

We received some great feedback from our precast piling work at West Thurrock for Industrial Chemicals Ltd.

David R Lovett, Design Office Manager and Project Engineer said:

“All of your operators were very helpful and professional in their approach to the works undertaken.”

17.01.2019

Project Award! 🏆 

360 No. 250mm, 300mm & 350mm square Precast Concrete Piles and 24 No. 244mm dia Steel Tubular piles, Start date: 14th February, RHS Garden, Bridgewater.

17.01.2019

📸 ”Photo of the Week’

Congratulations Richard Judd for sending in this week’s ‘Photo of the Week’. Aarsleff Ground Engineering have recently completed on site at a brewery in North Yorkshire installing precast piles for new yard vessels. Utilising their Junttan PMx22 rig, Aarsleff drove 59No. 300mm square precast concrete piles to a maximum depth of 12 metres. Aarsleff also installed piles for a pipe bridge which will connect the new vessels with the rest of the brewery. View the photo here.

16.01.2019

Project Award! 🏆 

1020m2 of 17m AZ20-700 piles, Start date: 18th March, Kings Lynn.

Project Award! 🏆 

109 No. 240mm square precast concrete piles, Start date: 25th February, WestOne Weston Super Mare.

Project Award! 🏆 

151 lin/m King Post Wall, Start date: 21st January for 4-5 weeks, Anglia Way, Mansfield.

11.01.2019

Project Award! 🏆 

61 No. SFA piles & 212 lin/m precast concrete ground beams, Start date: early February, Repton Village Hall.

11.01.2019

We’ve published the Monthly Round Up report for December 2018! Check it out by clicking here 

10.01.2019

Project Award! 🏆 

182 No. 250mm square precast concrete piles, Start date: early March, Nottingham Science Park Phase 1.

Project Award! 🏆 

15lin/m sheet pile retaining wall, Start date: 14th Dec 2018, Highfields Plots 77 & 78.

09.01.2019

🔉 Announcement

The Aarsleff board of directors have approved a name change for the Sheet Piling department. Going forwards, please ensure we refer to the department as ‘Specialist Retaining Walls’. The name is more inclusive and appropriate for the variety of disciplines the team offer, comprising King Post Walls, Sheet Piled Walls, Propped Walls & Anchored Walls. We will be announcing the change to the public in due course. Many thanks – Jessica Banham , Marketing & Communications Manager, Aarsleff Ground Engineering Ltd.

02.01.2019

Good morning to you all, and welcome to 2019! Happy New Year Everyone. Please find  a copy of the ‘Return to Work’ briefing. Please circulate to your sites/personnel and ensure this briefing is delivered on Monday the 7th Jan and a briefing register signed returned directly to Bob Speakman following the briefing. Download here.

20.12.2018

We’ve published the Monthly Round Up report for November! Check it out by clicking here 

Project Award! 🏆 

Torry Tank Quay, 69No. 339OD Driven Steel Tube, Starts Feb 18th for 6 days.

Project Award! 🏆 

40No 450di Bored piles, Start date TBC but sometime in February, Sheffield Weston Park Hospital Link Bridge, Duration 6 days.

19.12.2018

Project Award! 🏆 

28 No. SFA Piles, York Community Stadium, Starts 14th January for 7 days.

Project Award! 🏆 

368 No. Driven Steel Tube, Mapplewell, Lidl, Starts 4th February for 2 weeks.

19.12.2018

Pendragon Van Drivers – Opening times over the festive period

Please see below the seasonal opening hours for Pendragon van drivers. As yet I have no opening times for Total Motion, if I receive these I will forward them to you.

Please note Accident & roadside assistance is available 24/7.

Click here to download memo

– Zoe Botterill, Office Manager

18.12.2018

Memo 

Please be Advised that the site operatives meeting will no longer take place on the 4th January. There will also be no training on this day. This does mean those of you that took holiday for that day approved by Colin will have this returned to your entitlement on the holiday board in all other cases your holiday allowance is not affected, and you will have your normal Christmas break of two weeks. The intention is to hold this meeting towards the end of January, if any training becomes available this will be communicated to you.

– Zoe Botterill, Office Manager

18.12.2018

Project Award! 🏆 

1281 No Driven Precast Concrete Piles of 250/300mm section. Starts 29th March for 4 weeks with 2 rigs

17.12.2018

Project Award! 🏆 

What? 130 No 300mm 8m long driven precast concrete piles, Bradford Community College, 1 week starting w/c 14.01.19.

13.12.2018

Project Award! 🏆 

59No. 300mm Precast Concrete Piles, Heineken Brewery, Tadcaster, start date: 7th January for 4 days.

Project Award! 🏆 

62No. 250mm Precast Concrete Piles, Devon Paignton, start date: 4th Feb 2019 for 4 days.

11.12.2018

Project Award! 🏆 

43No. 250mm Precast Concrete Piles, Trelai, start date: mid Jan 2019 for 3 days

05.12.2018

Project Award! 🏆 

438No. 200mm Precast Concrete Piles, Bonvilston, start date: 14th January for 15 days

Project Award! 🏆 

95 lin/m of King Post Wall, Edenbridge – Station Road, start date 14th January – 22nd February

04.12.2018

Project Award! 🏆 

279No. 200mm Precast Concrete Piles and 953m of Precast Ground Beams, Lightfoot Lane, Preston, start date TBC

04.12.2018

📸

Today’s photo shows our very own placement student Zohaib Khan, proudly walking away with his prize for ‘Outstanding Performance in Engineering Surveying’ and picking up a £250 cash prize! Read the full story: Article and view photo here

29.11.2018

Project Award! 🏆 

25No 220 Bottom Driven Piles, Kingsbury Road, 14th Jan for 2 days

Project Award! 🏆 

52lin m of KP wall 2m ret hgt, Whitletts Site, Ayr, Starts 7th January 2019

28.11.2018

📸

Our ‘Photo of the Week’ goes to Brian Dick! Check out the tidy set up from piling works at Westbury STW here

28.11.2018

Project Award! 🏆

115No. Driven Precast Concrete Piles 250/300sq, Grantham, Starts 10 December for 1 week

Project Award! 🏆

8No. 500 dia sectional flight auger and 16no 300sq Driven Precast Concrete Piles, A33, Starts 10th Dec 2018

Project Award! 🏆

Drilling and Grouting, Kenton Bankfoot, Newcastle, 10 Dec to 11 Feb

Project Award! 🏆

2310m2 of Sheet Piling, Bedfordshire, Starts Jan 2019

Project Award! 🏆

179No. Driven Precast Concrete Piles, Boston, Lincolnshire, Starts 28th January for 9 days

Project Award! 🏆

Drilling and Grouting, Kenton Bankfoot, Mob Date: 10 Dec Duration: 9 weeks (to 11 Feb)

27.11.2018

Click here to download the latest Monthly Round Up for October 2018! 

26.11.2018

If you’re passionate about making a DIFFERENCE and becoming a DRIVING FORCE BEHIND OUR BEHAVIOURAL SAFETY INITIATIVE, TO IMPROVE OUR SAFETY CULTURE then we want you on-board. Please let Robert Speakman know if you’d like to become a member OF THE STEERING GROUP. Or speak to him for more information on what this involves. Email Robertspeakman@aarsleff.co.uk or call 01636 611140. Download the poster here 

26.11.2018

Reminder! In regards to the next quarterly Operatives gathering on Friday January 4th, and your training– Please return your acknowledgement slip to office manager Zoe Botterill – zoebotterill@aarsleff.co.uk– Thanks!

23.11.2018

Project Award! 🏆
Driven Precast Piling & Ground Beams,  Mirfield Calder View. Specifically, 118No. 200mm piles & 398m ground beams. Estimated start: 7th January

22.11.2018

Project Award! 🏆
Steel H-Section Piling, Teesport.  Estimated start: 10th January 2019

Project Award! 🏆
Driven Precast Concrete Piling, Branston Leas. Specifically, 1,057No Piles 200 & 250mm, Estimated start: 10th December 2018

22.11.2018

Safety Alert – Cementation Safety Note: Klemm Hydraulic Hold Back Device – Please click here to see full memo.

21.11.2018

📸

Our ‘Photo of the Week’ goes to Vasil Dilov – again! Check out the stunning photograph from Clacton-on-Sea here and here 

21.11.2018

Project Award! 🏆
Driven Precast Concrete Piling, Paragon Park, Coventry, 1,078No Piles 200 & 250mm, Estimated start: 26th November 2018

21.11.2018

Quarterly Site Operative Meetings – Friday 4th January 2019 🗓
Newark Office, Hawton Lane in the Casting Shed for 8:30am

Please see the latest Memo from Jody for more details about the meeting. There is also possible training opportunities available on the 3rd and 4th January. If you are interested in this please return the acknowledgement slip with the courses you are interested in to Zoe Botterill – Office Manager by 26th November.

20.11.2018

News – Aarsleff’s attitude toward Health & Safety commended by client – Read the full news story here

14.11.2018

Project Award! 🏆
Driven Steel Tube Piling,  Thornford STW. Estimated start 10th Dec. Specifically, 159No. 244mm driven steel tubes

13.11.2018

Project Award! 🏆
Driven Precast Piling & Ground Beams,  Hilton Park, Askern. Estimated start 10th Dec. Specifically, 165No. 200mm driven precast concrete piles & 577m ground beams

12.11.2018

Project Award! 🏆
Driven Precast Piling,  Darlington Red Barnes Way. Estimated start 14th Jan for 1 week. Specifically, 28No. 200mm driven precast concrete piles

09.11.2018

Project Award! 🏆
Driven Precast Piling,  Witney. Estimated start 12th Nov for 1-2 weeks. Specifically, 410No. 200mm & 250mm driven precast concrete piles

Project Award! 🏆
Driven Precast Piling,  CRODA Chemicals, Hull. Estimated start 19th Nov for 4 days. Specifically, 52No. 250mm driven precast concrete piles

09.11.2018

🔉 Announcement

Plant Investment – I am pleased to announce the following additions to our fleet:

  • Klemm 702 3G – October 2018
  • Klemm 909 3G – September 2018
  • ABI TM17 Leader rig – March 2019
  • Junttan PM16 – January 2019
  • Volvo EC380L Excavator for use with the SG75 Movax – January 2019
08.11.2018

Task Lighting 💡

With the dark nights now here, please could we make sure we have enough lighting to carry out our task safely and correctly.

If we do not have enough lighting on site, please speak to the main contractor or your line manager.

With site conditions becoming worse due to the weather, please also check your work areas are fit for the task and safe to work in. – James Batty, Geo Construction Manager

06.11.2018

📸

Our ‘Photo of the Week’ goes to Vasil Dilov! Check out the photo from Clacton-on-Sea here

06.11.2018

Project Award! 🏆
Driven Precast Piling,  West Thurrock, Essex. Estimated start 3rd Dec 2018 for 5 days. Specifically, 55No. 350mm driven precast concrete piles

02.11.2018

Project Award! 🏆
Driven Precast Piling,  Otley, West Yorkshire. Estimated start 26th Nov for 3 days. Specifically, 24No. 250mm driven precast concrete piles

02.11.2018

Policy Update – The Environmental Policy has been updated. Please now familiarise yourselves with it.  Thank you – Download the Environmental Policy

02.11.2018

Yet again, we received some positive feedback from our client Barnes Construction, at Newton Leys where Andy Hewkin, Gary McDermott and Carl Fleming are on site. Assistant Site Manager Jonny Oliver said:

“Thanks for your work on site, very pleased with the guys. Thank you.”

30.10.2018

🌟 Who is the next AarStar? Download the latest Staff Newsletter here! 

30.10.2018

We received EXCELLENT feedback from our client at Stantec for our driven precast piling work at Church Wilne. Site Manager Kevin Woolley commented:

“Excellent team with Keith and Dan who are very experienced and polite. Please pass my comments across to them both and thank them for both jobs they carried out on church wilne”

26.10.2018

Policy Update – The Occupational Health & Safety Policy has been updated. Please now familiarise yourselves with it.  Thank you – Download the Occupational Health & Safety Policy

22.10.2018

Click here to download the September 2018 monthly round up report. Thanks 

18.10.2018

Safety Alert – Robert Speakman – Lost time injury when an operative was exposed to grout which subsequently caused burns to his foot and ankle – Please click here to see full memo.

18.10.2018

Safety Notice – Robert Speakman –  Stay safe with the seasonal clock change! When the clocks go back, it can alter how you think, how you react and the quality of your sleep. It can take up to three days to adjust to the time shift. Take extra care during the first week after the change to allow your body to adapt. This year the clocks go back at 2am on the 28 October. The Royal Society of the Prevention of Accidents says there is a surge in the number of accidents when the clocks go back. Please take extra care during this period. This photograph illustrates the effects of low winter sun on general visibility! Plant operators and vehicle drivers must take care when manoeuvring, only doing so when it’s safe. They should ensure reversing aids are in good working order. Particular attention should be paid when approaching construction plant. Anyone experiencing the signs or symptoms of fatigue should report this to their manager or supervisor.

10.10.2018

⚽ Attention footballers! Would you like to play an 11-a-side match against the Aarsleff office? Register your interest by emailor calling 01636 611140. Once we have confirmed the players from both sides, we will schedule in the date and book a playing ground!

 09.10.2018

Please download the PPE form. This should be filled when requesting PPE from Aarsleff.

Adam Whitworth is your point of contact – 07792988174 or adamwhitworth@aarsleff.co.uk

You can either fill out the form, or ask Adam over the phone if he has the time to fill a request form out for you.

If the supervisor/Main contractor can not print the form out for you , please speak to your supervisor who can have the form posted out to there home.

DOWNLOAD PPE REQUEST FORM HERE!

 09.10.2018

Well done to those who worked on Dorset Gillingham STW. Our client from Wessex Water gave us an Excellent rating!

“Very well executed job from start to finish, look forward to having you work for us again”

28/09/2018

Safety Notice – Robert Speakman – Please remember October the 1st is the first day of the new period. Any items not displaying the correct colour ‘tag’ from 1st October should not be used until it has been thoroughly examined, or confirmed that a thorough examination has been carried out and a replacement ‘tag’ can be fitted. View Photo 

24.09.2018

Please make sure you download the following report – Monthly Round Up August- Thanks 

14.09.2018

Safety Alert – Robert Speakman – Hammer Drop happened on the 12/09/2018 – Please click here to see full memo.

13.09.2018

Safety Alert – Robert Speakman – RIDDOR reportable ‘specified injury’ – fall from height – Please click here to read full memo.

05.09.2018

Safety Alert – Robert Speakman – Drilling Rig overturned, happened on the 11/07/2018 – Please click here to read full memo.

14.09.2018

First post! Welcome Site Operatives.

 

What’s on your mind? If you have a question or concern, please send an email to info@aarsleff.co.uk