Smart Solution Generator >>>>

Get a quote >>>>
Sheet Piling and CFA to major sewage scheme in Newark
Sheet Piling and CFA piling on major Newark scheme

Aarsleff Ground Engineering has completed the CFA and Sheet piling works for a major new scheme that will protect homes in Newark from sewer flooding and provide a reliable water supply for decades to come. In 2016, Nick Wallace from Severn Trent explained that £60 million would be spent to replace more than 12 miles of old piles with new, larger ones.

Aarsleff worked on Queens Road to facilitate the replacement of a tunnel with a 1.5-metre diameter one. We employed an ABI TM13 /16SL with a Hydropress to pre-auger, and further installed 28no PU22- 12m long sheet piles.

Due to being in a residential and restricted area, Aarsleff employed a Silent Hydropress to drive in the sheet piles to reduce the vibration.

For more information about Aarsleff Ground Engineering or to send in your enquiry, call 01636 611140 and speak to a member of our expert team today, or drop us an email 

, , , , , , , , , , , ,