Aarsleff delivered a complex geotechnical design and technique to treat unstable loose soils to support modern new housing development
In June 2021, Aarsleff Ground Engineering was appointed by Crest Nicholson to undertake the treatment of loose, unstable grounds on a…
Drilling and Grouting treatment works undertaken to preserve and protect green land in a new residential area
In May 2021, Aarsleff Ground Engineering was appointed to service drilling and grouting treatment works by the LK Group, who are a…
Installing sheet piles for a new residential development on the River Thames.
Woolwich is a fast-developing London borough on the south
side of the River Thames and is home to the HYMAG Magazine
Archive and the historical Royal Arsenal. Located…
Drilling and Grouting specialist contractor Aarsleff Ground Engineering was appointed in November 2019 by Seddon Construction Ltd to deliver a mineshaft treatment package that formed part of a wider housing development scheme to include 63 plots. Two mineshafts required treatment…
Ouseburn Valley is to be a collection of 28 luxury two- & three bedroom apartments in the heart of Newcastle. The new development will transform a small area of land that once was the cattle sanatorium in Lower Steenberg’s Yard.…
Aarsleff Ground Engineering has recently completed a piling package on site for a new housing development in Perry Barr, Birmingham.
Perry Park View, a Persimmon Homes development situated 4 miles north of Birmingham, will provide a range of 1, 2…
CFA piling for new development on a former quarry
Aarsleff Ground Engineering have completed the piling works for a new residential development in Leighton Buzzard.
Leestone Park is part of the Eastern Leighton Linslade Urban Extension Scheme, which will see…