Aarsleff Ground Engineering has completed a specialist steel tube piling project to revive an existing crane rail foundation.
Our piling team have completed phase 1 of a restoration project using raked steel tubes.
Split over two phases, TPS Civil Engineering…
UK railway network owner and infrastructure manager, Network Rail, awarded Buckingham Group Contracting the design and build of a new two-storey office and storage building at their existing Maintenance Delivery Unit (MDU) in Holbeck.
The depot, which is off Nineveh…
Stabilising an embankment with a contiguous piled wall
Aarsleff Ground Engineering have completed on site installing a contiguous piled retaining wall for a new train maintenance facility in Scarborough.
The new train care facility will provide maintenance services including fuelling…
Soil Nails and wailing beams for bridge wall stabilisation at Churchdown, Underbridge
Aarsleff Ground Engineering have recently completed installing soil nails to repair and stabilise the failing wing walls on an existing bridge in Churchdown. Contracted by Taziker Industrials, Aarsleff…
A&J Geotechnical, part of Aarsleff Ground Engineering, were awarded the Tubelines ground engineering contract in Sudbury, Suffolk.
Utilising a radio controlled baby rig with a 12mtr long telescopic Kelly bar, we installed some 400no 450mm diameter bored piles to stabilise…
Aarsleff Ground Engineering, have an ongoing contract with a major supplier to Network Rail for the supply and installation of telecommunication towers along the East Coast Rail Network.
Utilising their Baby Mait rig and Beretta T53, Aarsleff were able to…
A&J Geotechnical, part of Aarsleff Ground Engineering, won the Ground Engineering contract to install a series of king posts on an existing road on behalf of Network Rail.
The existing road was on the move towards the adjacent railway. A&J…