Foundation system installed at Longshoot in Nuneaton Phase 2

Davidsons Homes awarded Aarsleff Ground Engineering the foundations contract for phase 2 of a residential development on The Long Shoot in Nuneaton, Warwickshire, comprising 2, 3, 4 and 5 bedroom homes. The development will consist of 250 residential dwellings arranged each side of a central access road along the length of the site.

The development site is located off the A47 The Long Shoot approximately 2km north east of Nuneaton town centre and forms phase 2 of the residential scheme at this site.

From Aarsleff’s Banut 300 rig arriving to the last beam grouted, the team installed a total of 130No piles and 450m of beam in just 11 site days.

Integrating seamlessly with Aarsleff’s piling solutions; the Centrum Ground Beam System allows a one-stop-shop approach for your foundation requirements.

Read more…

Download Case Study

, ,