Smart Solution Generator >>>>

033

Aarsleff has carried out the piling work for two apartment buildings in Hythe in South East England. During the design phase, the scope of the project altered, so instead of the planned 920 metres of driven piles, we ended up installing in excess of 2,000 metres. Still, we managed to complete our work three days ahead of schedule. The project in Hythe was carried out in cooperation with a groundworks contractor called Abbey Pynford who have developed their own special method of installing floor slabs.

 

, , , , , ,