Driven Piling for Whitehill Asphalt Plant in Port of Tyne

Aarsleff Ground Engineering was awarded the foundations contract on behalf of the main client Ahman Group for contractor Northumbrian Roads Ltd to install piles for a new asphalt plant at North Shields, Port of Tyne site, only 5 minutes from our North-East office. The plant is a modern self-contained system whereby aggregates are loaded into bins, weighed in hoppers and transported into a mixing tower via conveyor belts. The plant will produce asphalt for mainly highway surfacing.

Aarsleff Ground Engineering installed 100no 300mm square precast concrete driven piles of 6mtr length driven in made ground over stiff to very stiff clay. With Aarsleff’s own Junttan PM20 HLC-5, the piles were successfully installed over a 9 day construction period.