Precast Piling Bowburn

Aarsleff Ground Engineering have completed the install of precast concrete piles for a warehouse at a newly developed Integra 61 logistic park.

Set to be largest scale logistics and manufacturing development the North East, Integra 61 is situated off Junction 61 of the A1(M). The location of the logistics park makes it ideal for travel with Newcastle, Leeds, York, Manchester and Sheffield being easily accessible, along with major north coast ports including Teesport, Port of Tyne and Hartlepool. The master plan of the development is to include 9 warehouses ranging in size from 12,000sq ft to nearly 2 million sq ft. Additional housing and facilities are also planned to be built as part of the development.

Aarsleff were awarded the piling for the project by ISG, which included installing over 2,400no. precast concrete and steel tubular piles for the largest warehouse on the logistics park – a 1,951,637sq ft unit with attached office space and an extensive amount of loading bays and car parking.

Read more…

Download Case Study

,